HomeMy WebLinkAboutPlumbing Y1-238-0207-P
~
OJHKOJH
City of Oshkosh
Inspection Services
215 Church Ave., PO Box 1130
Oshkosh, WI 54902-1130
(920) 236-5052 (920) 236-5184 FAX
ON THE WATER
February 19, 2007
Badger Excavating LLC
P. O. Box 584
Green Lake, WI 54941
Ref: Plumbing Plan Approval:
Morgan Crossing (exterior only)
495 Pearl Ave. Oshkosh, WI
Plan 10# Y1-238-0207-P
Dear Sirs,
Examination of the plumbing plans and specifications for this project has been completed. In
accord with Chapter 145, Wisconsin Statute, and COMM 81 through 85, Wisconsin
Administrative Code, the plumbing plans and specifications are approved contingent upon
compliance with the stipulation(s) noted below.
1. Sewer and water service shall maintain a minimum of 8 feet horizontal separation per COMM
82.40
2. Horizontal storm inlet grates shall be installed that will not pass a 6 inch sphere per COMM
82.36
3. Floor or ground surface inlets for storm sewer shall be of a size that prohibits the entrapment
of wheeled vehicles, wheelchairs or pedestrians within the grate openings COMM 82.36
In the event installation of this plumbing system has not commenced within two years from this
date, this approval shall become void. A new application accompanied by full examination
fees shall be filed and an updated approval received before work may commence.
In granting this approval, the City of Oshkosh or its representative does not hold itself liable for
any defects in plans or specifications, plan omissions, examination oversight, construction or
any damage that may result in or after installation. The City of Oshkosh reserves the right to
order changes or additions should conditions arise making this necessary.
It shall be necessary for the installing plumber to obtain a plumbing permit from the City of
Oshkosh before proceeding with actual installation of this plumbing system or any of its parts.
Respectfully,
Richard Wood,
Plumbing Inspector