HomeMy WebLinkAbout2007-Building
o CITY OF OSHKOSH No 123548
OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 3001 S WASHBURN ST Owner FIRST HORIZON GROUP LIMITED PTNSHP Create Date 02/14/2007
Designer
Contractor ADVANCED CONSTRUCTION SERVICES
Category
232 - Alteration Stores & Customer Service Plan X1-1881-0107
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size NO CHANGE
Finished/Living
Sq. Ft.
Sq. Ft.
Sq. Ft.
Rooms
Height
Ft.
D Projection I
Unfinished/Basement
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Not Required
Flood Plain
Height Permit
# Dwelling Units
o
# Structures
o
Park Dedication
Use/Nature
of Work
10 - Aeropostale -Interior alterationslremodel for new tenant
HV AC Contractor
CENTRAL HEATING SERVICE INC
Plumbing Contractor OGDEN PLUMBING
Electric Contractor BUSS ELECTRIC INC
Fees: Valuation . Uo.oo
Issued By: ~
Plan Approval
$0.00 Permit Fee Paid
$346.00 Park Dedication
$0.00
Date 02119/2007
Final/OJ). 00/00/0000
D Permit Voided I
Parcelld # 1329420000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approv s before starting such activity.
Signature
Date Z~\C\~~aJ
~ ~
s; r T\2bSz.A ~gentlOwner
Address 2201 BABCOCK BLVD PITTSBURGH
PA 15237 - 0000 Telephone Number 412-82H~780
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how dowe gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.