Loading...
HomeMy WebLinkAbout2007-Building o CITY OF OSHKOSH No 123548 OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 3001 S WASHBURN ST Owner FIRST HORIZON GROUP LIMITED PTNSHP Create Date 02/14/2007 Designer Contractor ADVANCED CONSTRUCTION SERVICES Category 232 - Alteration Stores & Customer Service Plan X1-1881-0107 Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size NO CHANGE Finished/Living Sq. Ft. Sq. Ft. Sq. Ft. Rooms Height Ft. D Projection I Unfinished/Basement Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Not Required Flood Plain Height Permit # Dwelling Units o # Structures o Park Dedication Use/Nature of Work 10 - Aeropostale -Interior alterationslremodel for new tenant HV AC Contractor CENTRAL HEATING SERVICE INC Plumbing Contractor OGDEN PLUMBING Electric Contractor BUSS ELECTRIC INC Fees: Valuation . Uo.oo Issued By: ~ Plan Approval $0.00 Permit Fee Paid $346.00 Park Dedication $0.00 Date 02119/2007 Final/OJ). 00/00/0000 D Permit Voided I Parcelld # 1329420000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approv s before starting such activity. Signature Date Z~\C\~~aJ ~ ~ s; r T\2bSz.A ~gentlOwner Address 2201 BABCOCK BLVD PITTSBURGH PA 15237 - 0000 Telephone Number 412-82H~780 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how dowe gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.