Loading...
HomeMy WebLinkAbout0121764-Building (sign) "."' to, o OSHKOSH ON THE WATER Job Address 2900 ATLAS AVE CITY OF OSHKOSH No 121764 BUILDING PERMIT - APPLICATION AND RECORD Owner CHAMCO Create Date 09/28/2006 Designer Contractor SIGNS NOW Category 254 - Signs Plan Type o Building . Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Sq.Ft. Sq.Ft. Rooms Height Ft. D Projection I Finished/Living Bedrooms Stories Canopies Garage Baths Signs Foundation o Poured Concrete o Floating Slab o Pier . Other o Concrete Block o Post o Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature Distribution Warehouse I Install a 8x20 non-illuminated wall sign at south end of east face of building: Late Permit. of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $2,000.00 Plan Approval $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Issued By: Date 09/28/2006 Final/O.P. 0010010000 D Permit Voided I Parcel Id # In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement City strongly urges the permit applicant to contact the easement holder( and to se ure any ne~approvals'be~ starting such activity. Signature Date 'f[ ~/()b Address 558 EISENHOWER DR Agent/Owner KIMBERLY WI 54136 - 0000 Telephone Number 920-993-9600 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.