Loading...
HomeMy WebLinkAbout0123534-Plumbing (water heater) o OSHKOSH ON THE WATER Job Address 701 N MAIN ST CITY OF OSHKOSH No 123534 PLUMBING PERMIT - APPLICATION AND RECORD Owner 701 MAIN INC Create Date 02116/2007 Plan Contractor MOREMAN PLBG & HTG SERVICE INC Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Category 441 - Industrial-Water Heaters Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs COMM (Mabel Murphy's) - Replace gas water heater. **DEBIT ACCT**. Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcel Id # 1004300000 Valuation Issued By Shower Water Softner Wait. St. Shamp Sink Floor Drain Local Waste Ice Chest FlrlWst Sink Lndry Tray Clothes Wshr Exam Sink Catch Basin Disposal Bidet Sculry Sink Wash Ftn Dishwasher Beer Tap Hand Sink Urinal Sump Pump Lab Sink Plaster Sink Standp Rec Classrm Sink Sterilizer Surgeons Sink Ice Maker Breakrm Sink Dip Well F Prep Sink Gar Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp $650.00 $0.00 $25.00 0 Permit Voided I Date 02116/2007 . Permit Fees Plan Approval In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner 0/rnAJ Address PO BOX 1325 OSHKOSH WI 54903 - 0000 Telephone Number 231-9191 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Buildingif Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.