Loading...
HomeMy WebLinkAbout2007-Building (fire damage) o OSHKOSH ON THE WATER Job Address 508 W 4TH AVE CITY OF OSHKOSH No 123535 BUILDING PERMIT - APPLICATION AND RECORD Owner DANIEL E DOWLING Create Date 02/14/2007 Designer Contractor KELLER STRUCTURES Category 262 - City of Oshkosh-Alteration Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Sq.Ft. Rooms Height Ft. D Projection I Finished/Living Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation 0 Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier . Other o Treated Wood Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature Sanitation Garage / Repair Fire Damage to North Wall: replace misc. structural/framing members, insulation, wall panels and repair of Work am aged sections of foundation. HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation ~,800.00 Plan Approval Issued By: ~ $0.00 Permit Fee Paid $0.00 Park Dedication $0.00 Date 02/16/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 0600070000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address PO BOX 620 KAUKAUNA WI 54130 - 0000 Telephone Number 414-766-5795 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.