HomeMy WebLinkAbout2007-Building (fire damage)
o
OSHKOSH
ON THE WATER
Job Address 508 W 4TH AVE
CITY OF OSHKOSH No 123535
BUILDING PERMIT - APPLICATION AND RECORD
Owner DANIEL E DOWLING Create Date 02/14/2007
Designer
Contractor
KELLER STRUCTURES
Category
262 - City of Oshkosh-Alteration
Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement
Sq. Ft.
Sq.Ft.
Rooms
Height Ft.
D Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
Sq.Ft.
Baths
Signs
Foundation 0 Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier . Other
o Treated Wood
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature Sanitation Garage / Repair Fire Damage to North Wall: replace misc. structural/framing members, insulation, wall panels and repair
of Work am aged sections of foundation.
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation ~,800.00 Plan Approval
Issued By: ~
$0.00 Permit Fee Paid
$0.00 Park Dedication
$0.00
Date 02/16/2007
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 0600070000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address
PO BOX 620
KAUKAUNA
WI 54130 - 0000
Telephone Number
414-766-5795
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.