Loading...
HomeMy WebLinkAbout0123492-Building e OSHKOSH ON THE WATER Job Address 843 W SOUTH PARK AVE CITY OF OSHKOSH No 123492 BUILDING PERMIT - APPLICATION AND RECORD Owner DENNIS/LINDA METZLER Create Date 02/13/2007 Designer Contractor MACK CONSTRUCTION Category 140 -Interior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Sq.Ft. Sq.Ft. Sq.Ft. Rooms Height Ft. D Projection I Unfinished/Basement Finished/Living Bedrooms Stories Canopies Signs Garage Baths Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature FR/ Remodeling the kitchen' to include gutting walls down to the studs opening up a wall with properly sized header, new drywall and of Work binets and countertops. Plumbing Contractor UNKNOWN HV AC Contractor Electric Contractor UNKNOWN???? $20,000.00 Plan Approval $0.00 Permit Fee Paid $148.00 Park Dedication $0.00 Fees: Valuation Issued By: ~ Date 02/13/2007 FinaIlO.P. 00/00/0000 D Permit Voided I Parcelld # 1306930700 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secfl~e any necessary ~.~o~~ bef~e starting such activity. Signature I . I '!A./f UA- Date J<:?- -18 - {J 7 Agent/Owner Address 843 W SOUTH PARK AVE OSHKOSH WI 54902 - 6377 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.