Loading...
HomeMy WebLinkAbout0122681-Building o OSHKOSH ON THE WATER Job Address 2755 ATLAS AVE CITY OF OSHKOSH No 122681 BUILDING PERMIT - APPLICATION AND RECORD Owner VIKING ELECTRIC Create Date 09/27/2006 Designer Contractor R J ALBRIGHT INC. Category 209 - New Industrial Plan V6-98-0906 Type . Building o Sign o Canopy o Fence o Raze Zoning M3 Class of Const: 2Bibc Size 125x200 Unfinished/Basement Sq.Ft. 25000 Sq. Ft. Sq.Ft. Rooms Height Ft. o Projection I Finished/Living Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood :r c,~ i ; Occupancy Permit Required Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures Use/Nature New Distribution Warehouse - 25,000 sf, Work above the Foundation" Note: This is a Late Permit, the building skeleton was found of Work erected on Saturday 11/4/06. HV ACContractor Plumbing Contractor H".' Electric Contractor Fees: Valuation $750,000.00 Plan Approval Issued By: ~t..J $0.00 Permit Fee Paid $2,338.mVPark Dedication $0.00 Date 11/27/2006 Final/O.P. 00/00/0000 o Permit Voided I Parcelld # In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and t e any e pprovals bef re starting such activity. Signature Agent/Owner OSHKOSH Date L1/z;J/t;L Address 5711 GREEN VALLEY RD WI 54904 - 0000 Telephone Number 231-8635 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.