Loading...
HomeMy WebLinkAbout0123482-Plumbing (laterals) e OSHKOSH ON THE WATER Job Address 1055 JOHN MOORE DR CITY OF OSHKOSH No 123482 PLUMBING PERMIT - APPLICATION AND RECORD Shower Floor Drain lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Gri nd Owner RUSCH HOMES LLC Create Date 02/12/2007 Category 401 - Residential-Exterior (laterals) Plan Water Softner Wait. St. Shamp Sink Coffee Maker local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Contractor J & P EXCAVATING Bathtub Whirlpool lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature NSFR laterals **debit acct of Work Valuation Issued By Size # Conn. Type New Material Plastic Type Lateral Sanitary Sewer 4" Storm Sewer 4" Plastic Lateral Repair Water Service 1-1/4" Plastic Lateral New Parcel Id # $1,500.00 Plan Approval $0.00 Permit Fees $150.00 D Permit Voided I Date 02/12/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work described in this penmit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 3162 SCENIC DR OSHKOSH WI 54904 - 0000 Telephone Number 379-0309 (C) To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (I.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.