Loading...
HomeMy WebLinkAboutPlumbing X1-235-0207-P ,,"t,- ~ OJHKOJH City of Oshkosh Inspection Services 215 Church Ave., PO Box 1130 Oshkosh, WI 54902-1130 (920) 236-5052 (920) 236-5184 FAX ON THE WATER February 12, 2007 MP Kelly Plumbing, INC. 665 N Main St. Oshkosh, WI 54901 Ref: Plumbing Plan Approval: Commercial Interior Rem()del 1014 Ohio St., Oshkosh, WI Plan ID# X1-235-0207-P Dear Sirs, Examination of the plumbing plans and specifications for this project has been completed. In accord with Chapter 145, Wisconsin Statute, and COMM 81 through 85, Wisconsin Administrative Code, the plumbing plans and specifications are approved contingent upon compliance with the stipulation(s) noted below. 1. The total drainage load in any portion of drain piping shall not exceed the limits specified in Tables 82.30-2 and 82.30-3. Comm 82.30(4) 2. Drain piping serving a circuit vent shall be properly sized. A horizontal drain served by a circuit vent shall not diminish in size from the connection to the drain stack to the circuit vent connection. Comm 82.31(10)(c) 3. Ice storage compartments shall discharge to the sanitary drain system through indirect waste piping by means of an air-gap. The indirect waste piping shall not I exceed 30" in length. The indirect waste piping may not discharge or connect to the indirect waste piping or local waste piping of any other fixture. Comm 82.33(9)(g)3.a. & b. 4. Vent size and maximum length of vent piping shall be determined in accordance with Table 82.31-3. Drawing shows 54 DFU vented with 2" @ 50' maximum developed length, be aware of overall 2" vent distance in field. Comm 82.31 (14) 5. The discharge pipe serving a water heater relief valve shall be installed to drain by gravity flow to a floor served by a floor drain or to a receptor in accordance with s. Comm 82.33(8). The discharge pipe for a water heater shall terminate within the same room or enclosure within which the water heater is located. Comm 82.40(5)(d)5.e. & f. 6. The sizing of the water supply system shall be based on the empirical method and limitations outlined in this subsection or on a detailed engineering analysis acceptable to the department. Controlling fixture is determined to be far hand sink at the bar area, due to pressure loss in the length of the water supply system. Comm 82.40(7) 7. A control valve shall be installed in the supply piping to each water heater and water treatment device and in the fixture supply to each plumbing fixture, plumbing appliance and piece of equipment. Comm 82.40(4)(c)b. " .t / t In the event installation of this plumbing system has not commenced within two years from this date, this approval shall become void. A new application accompanied by full examination fees shall be filed and an updated approval received before work may commence. In granting this approval, the City of Oshkosh or its representative does not hold itself liable for any defects in plans or specifications, plan omissions, examination oversight, construction or . any damage that may result in or after installation. The City of Oshkosh reserves the right to order changes or additions should conditions arise making this necessary. It shall be necessary for the installing plumber to obtain a plumbing permit from the City of Oshkosh before proceeding with actual installation of this plumbing system or any of its parts. Respectfully, Paul Wolf, Plumbing Inspector 6 f~ OSHKOSH ON THE WATER Oshkosh Plan Approval Form Job Address 1014 OHIO ST Approval Number 1903 Approval Type Plumbing Submitter's Name MP Kelly Inc Address 665 N MAIN ST OSHKOSH Plan X1-235-0207-P WI 54901 Owner Name BRETT JUNGWIRTH RENTALS LLC Address 1014 OHIO ST OSHKOSH WI 54902 o Type of Plan Commercial Interior Remodel/ New Bar Fee $210.00 Date Received 02/12/2007 Date Approved 2/12/2007