Loading...
HomeMy WebLinkAbout0123469-Plumbing o OSHKOSH ON THE WATER Job Address 860 WISCONSIN ST CITY OF OSHKOSH No 123469 PLUMBING PERMIT - APPLICATION AND RECORD Owner DISCOVERYPROPERTIES LLC Create Date 02/09/2007 Category 410 - Residential-Interior Plan Contractor WELLNITZ PLUMBING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature Install new piping and new kitchen sink and reset existing water closet and lavatory. of Work Shower Water Softner Wait. St. Shamp Sink Floor Drain Local Waste Ice Chest FlrlWst Sink 0 Lndry Tray Clothes Wshr Exam Sink Catch Basin Disposal Bidet Sculry Sink Wash Ftn Dishwasher Beer Tap Hand Sink Urinal Sump Pump Lab Sink Plaster Sink Standp Rec Classrm Sink Sterilizer Surgeons Sink Ice Maker Breakrm Sink Dip Well F Prep Sink Gar Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Coftee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 0500950000 $25.00 D Permit Voided I $1,550.00 Plan Approval $0.00 Permit Fees Valuation Issued By Date 02109/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s to secure ~~ary_.a. _pprov:"I.~~~fore starting such activity. Signature ~A"" - Date ;2.. q () 7 Agent/Owner Address 4810 AMBERWOOD LN APPLETON WI 54915 - 0000 Telephone Number (0)231-7390 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.