HomeMy WebLinkAbout0123469-Plumbing
o
OSHKOSH
ON THE WATER
Job Address 860 WISCONSIN ST
CITY OF OSHKOSH No 123469
PLUMBING PERMIT - APPLICATION AND RECORD
Owner DISCOVERYPROPERTIES LLC Create Date 02/09/2007
Category 410 - Residential-Interior
Plan
Contractor WELLNITZ PLUMBING
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature Install new piping and new kitchen sink and reset existing water closet and lavatory.
of Work
Shower Water Softner Wait. St. Shamp Sink
Floor Drain Local Waste Ice Chest FlrlWst Sink
0 Lndry Tray Clothes Wshr Exam Sink Catch Basin
Disposal Bidet Sculry Sink Wash Ftn
Dishwasher Beer Tap Hand Sink Urinal
Sump Pump Lab Sink Plaster Sink Standp Rec
Classrm Sink Sterilizer Surgeons Sink Ice Maker
Breakrm Sink Dip Well F Prep Sink Gar Drain
Ejector/Grind Drink Ftn Serv Sink Soda Disp
Coftee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Size
Material
Type
#
Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
0500950000
$25.00 D Permit Voided I
$1,550.00
Plan Approval
$0.00
Permit Fees
Valuation
Issued By
Date 02109/2007
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s to secure ~~ary_.a. _pprov:"I.~~~fore starting such activity.
Signature ~A"" - Date ;2.. q () 7
Agent/Owner
Address 4810 AMBERWOOD LN
APPLETON
WI 54915 - 0000 Telephone Number (0)231-7390
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.