Loading...
HomeMy WebLinkAbout0123467-Plumbing o OSHKOSH ON THE WATER Job Address 2211 OREGON ST CITY OF OSHKOSH No 123467 PLUMBING PERMIT - APPLICATION AND RECORD Category 440 - Industrial-Interior Owner COYOTE OF WISCONSIN LLC Create Date 02108/2007 Plan Contractor WELLNITZ PLUMBING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Water Softner Wait. St. Shamp Sink Local Waste Ice.Chest FlrlWst Sink Clothes Wshr Exam Sink Catch Basin Bidet Sculry Sink Wash Ftn Beer Tap Hand Sink Urinal Lab Sink Plaster Sink Standp Rec Sterilizer Surgeons Sink Ice Maker Dip Well F Prep Sink Gar Drain Drink Ftn Serv Sink Soda Disp Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn. Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Unit D Tenant space, install new wall hung urinal, relocate lavatory and drinking fountain. I Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1410280000 Valuation $2,500.00 Plan Approval Issued By $0.00 $25.00 0 Permit Voided I Date 02/09/2007 Permit Fees In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) an secure an ecessary approvals before starting such activity. Signature D~ -4~7 Telephone Number (0)231-7390 Address 4810 AMBERWOOD LN Agent/Owner APPLETON WI 54915 - 0000 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.