Loading...
HomeMy WebLinkAboutNoncompliance Soil Erosion "" ","" ;,,-,...,~ l-' NOTICE OF NONCOMPLIANCE SOIL EROSION DATE INSPECTED: January 11. 1995 JOB ADDRESS: 1828 McCurdy Street CONTRACTOR: Dewey Homes. Inc. ADDRESS: 1007 Tyler Avenue CITY/ZIP: Oshkosh. WI 54901 A stone tracking pad and properly installed filter fence must be utilized per ILHR 21.125. These measures must be maintained until the site has been stabilized. Failure to comply may result in the posting of a STOP WORK ORDER at the job site! (Please note: A properly installed filter fence must have the base of the filter fabric entrenched at least 4 inches. Also, the stakes must be on the downslope side of the fabric. Soils tracked on to the street shall be cleaned up by the end of the same work day.) Call 236-5051 to arrange for a soil erosion inspection upon completion of necessary measures. COMPLIANCE DATE: Immediately ",--, INSPECTOR: Ken StaehlerX~