HomeMy WebLinkAboutNoncompliance Soil Erosion
""
","" ;,,-,...,~ l-'
NOTICE OF NONCOMPLIANCE
SOIL EROSION
DATE INSPECTED: January 11. 1995
JOB ADDRESS: 1828 McCurdy Street
CONTRACTOR: Dewey Homes. Inc.
ADDRESS: 1007 Tyler Avenue
CITY/ZIP: Oshkosh. WI 54901
A stone tracking pad and properly installed filter fence must be utilized per ILHR 21.125. These
measures must be maintained until the site has been stabilized. Failure to comply may result in
the posting of a STOP WORK ORDER at the job site!
(Please note: A properly installed filter fence must have the base of the filter fabric
entrenched at least 4 inches. Also, the stakes must be on the downslope side of the fabric.
Soils tracked on to the street shall be cleaned up by the end of the same work day.)
Call 236-5051 to arrange for a soil erosion inspection upon completion of necessary measures.
COMPLIANCE DATE: Immediately
",--,
INSPECTOR: Ken StaehlerX~