HomeMy WebLinkAbout2007-Building & HVAC X1-1881-0107
~
OJHKOfH
City of Oshkosh
Division of Inspection Services
215 Church Avenue
PO Box 1130
Oshkosh WI 54903-1130
www.ci.oshkosh.wi.us
ON THE WATER
February 6, 2007
Gary Atcheson
Lami Grubb Architechts
100 E Swissvale Ave
Pittsburgh, PA 15218-1439
Hallberg Engineering
1750 Connnerce Court
White Bear Lake, MN 55110
Kristen Shoemaker
Prime Retail
217 E Redwood St 20th Floor
Baltimore MD 21202
Michael Bowen
Aeroposta1e Inc
201 Willowbrook Blvd 7th Floor
Wayne NJ 07470
Site: . Plan Number: Xl-1881-0107
Aeropostale
3001 S Washburn S1. Space C 010
Oshkosh WI 54904
For:
Description: Tenant space alterations
Object Type: Building & HV AC
Class of Construction: lIB - 3487 Sq Ft.; Sprinklered
Occupancy: M: Mercantile I Retail
Maximum No of Occupants: 95
The submittal described above has been reviewed for conformance with applicable Wisconsin Administrative Codes and
Wisconsin Statutes. The submittal has been CONDITIONALLY APPROVE)). The owner;as defmed in Chapter
101.01(10), Wisconsin Statutes, is responsible for compliance with all code requirements
Key Item(s) I Conditions:
· IBC 711.3 Any penetrations of fire rated assemblies are required to be protected with a listed firestopping
system that matches the rating of the wall assembly being penetrated. Copies of the firestopping systems
are required to be provided at the time of inspection.
· IBC 901.2 Fire protection systems shall be installed, repaired, operated and maintained in accordance with
this code and the international fire code. Construction of new walls may require the addition and or
. relocation of sprinkler heads to maintain required coverage, and not obstruct spray patterns offire
sprinklers
· IBC 906.1/ IFC 906.3 The maximum travel distance allowed to afire extinguisher is 75 feet.
· IBC 1003.2.11 Means of egress illumination is required to be installed per this section. All paths of egress
are required to have adequate emergency lighting to meet the performance requirements ofIBC
1003.2.11.3. Existing means of egress emergency lighting is permitted to be maintained in compliance
with the code in effect at the time of construction. Any altered path of egress, or new path of egress,
and any new emergency lighting being installed is required to comply with current code requirements.
I.\t:I$~'1,:'(;ti;xls\Pkm Re~.i{':w\CL~n:nm;.,...:br P!~UI R~'\l<,"""
Y)Ol S \Vz~$hbumSt Acr-o')<.~~t:.J.~ BU~= & H\."AC.dv';
Page lof3
· IBC 1101.2/ANSI A117.1-308.2 & 3 - Mechanical system controls shall be located a maximum of48"
above the finished floor if the floor space allows a forward approach by a wheel chair or if the clear space
allows a parallel approach.
· IECC 503.3.3.7 [Comm 63.0503(2)(f)] Balancing and documentation of the HV AC system shall conform
to the IMe. Balancing report required to be submitted prior tofinal occupancy being allowed.
· IECC 803.3.3.3 Off-hour controls; Each zone shall be provided with thermostatic setback controls that
are controlled by either an automatic time clock or programmable control system.
· IMC 602.2.1 Materials exposed within plenums. Except as required by Sections 602.2.1.1 through
602.2.1.4, materials exposed within plenums shall be noncombustible or shall have a flame spread index of
not more than 25 and a smoke-developed index of not more than 50 when tested in accordance with
ASTM E 84. Caution on materials and equipment - i.e. speakers security equipment being located
above ceiling within the plenum space.
· IMC 606.2.1 Smoke detectors shall be installed in return air systems with a design capacity greater than
2000 efm......
· IMC 606.4.1 The duct smoke detectors shall be connected to a fire alarm system. The actuation of a
smoke detector shall activate a visible and audible supervisory signal at a constantly attended location.
· IMC 606.4.1 Exception 2. In occupancies not required to be equipped with a fire alarm system, actuation
of a smoke detector shall activate a visible and an audible signal in an approved location. Smoke detector
trouble conditions shall activate a visible or audible signal in an approved location and shall be identifies
as air duct detector trouble. .
· Comm 63.1048 Area category method. When the Area Category Method is used to calculate the interior
lighting power allowance for an entire building, main entry lobbies, corridors, rest rooms, and support
functions shall be treated as separate areas. Revised lighting calculations received on 2/6/07 have been
approved -fIXture schedule shown on plans has been modified to comply with energy codes - verify
that changes are communicated to persons in the field.
· Comm 61.31(4) Revisions to approved plans. All proposed revisions and modifications which involve
. rules under this code and which are made to construction documents that have previously been granted
approval by the department or its authorized representative, shall be submitted to the office that granted the
approval. Allrevisions and modifications to plans shall be approved in writing by the department or its
authorized representative prior to the work involved in the revision or modification being carried out. A
revision or modification to a plan, drawing or specification shall be signed and sealed in accordance with
Comm 61.31(1).
· MUN 30 This review does not include review for signage. Applications for and questions regaurding
signage permits should be directed to David Buck - Associate Plariner (920) 236-5062.
1 ,'jD~'p~(;ti:m:-;\Pkm R~..."it:w\Ct~n1n~:,.(i:il Pi..m Re\1l,.'\N ~(;(,>7\X'~ ,.1 gS"i -0'1.); .l.(:..nj S W:'i:;hb;l!"n
BUg & HVAC.~b.;
Page 2 00
SUBMIT:
· IBC 1003.2.11 Means of egress illumination is required to be installed per this section. All paths of egress
through The Retail Display area are required to have adequate emergency lighting to meet the performance
requirements ofIBC 1003.2.11.3. Provide complete emergency lighting plan showing compliance with
these requirements prior to installation of emergency lighting system.
· IECC 503.3.3.7 [Comm 63.0503(2)(f)] Balancing and documentation of the HVAC system shan conform
to the IMC. Balancing report required to be submittedprior to final occupancy bei",gall~w(!d.
· Comm 61.50 (4) Supervision. Prior to the initial occupancy of an alteration the supervising professional
shall file a compliance statement form SBD-9720 with this office.
A copy of the approved plans, specifications, and this letter shall be em-site during construction. All permits are required to
be obtained prior to connnencement of work.
In granting this approval the City of Oshkosh Inspection Services Department reserves the right to require changes or
additions should conditions arise making them necessary for code compliance. As per state stats 101.12(2), nothing in this
review shall relieve the designer of the responsibility for designing a safe building, structute, or component.
. orrespondence may be made to me at the number listed below or the address on this letterhead.
oe
Building Systems Consultant
(920) 236-5051 Monday- Friday 7:30 A.M. to 8:30 A.M and 12:30 A.M to 1:30 P.M.
bnoe@ci.oshkosh.wi.us
cc: Property file
Fee Required $
Fee Received $
Balance Due $
590.00
590.00
0.00
I. \b;~~diL~n:-;<:Pkn Rc",'i,~\>o.i\(\\n!l~'1,7;;hl Pl<m R~\'l~''W :()G7;X l__j ~Sl-(l jt)'? ::'ODJ S 'W.::,~hbw,-1;, StAcr0pE.~st~;l,: mJ.I~ &' IIV AC ,k)(;