Loading...
HomeMy WebLinkAboutPlumbing W2-224-1106-P ~ OJHKOJH City of Oshkosh Inspection Services 215 Church Ave., PO Box 1130 Oshkosh, WI 54902-1130 (920) 236-5052 (920) 236-5184 FAX ON THE WATER November 13, 2006 Patrick G. Blees Architect 219 North Second Street, Suite 301 Minneapolis, Minnesota 55401-1454 Ref: Plumbing Plan APproval:~~K~~rr~~~~~~~~L'1 "Plan ID#~~:'j5 iL'__'~~~'- Dear Sirs, Examination of the plumbing plans and specifications for this project has been completed. In accord with Chapter 145, Wisconsin Statute, and COMM 81 through 85, Wisconsin Administrative Code, the plumbing plans and specifications are approved contingent upon compliance with the stipulation(s) noted below. 1. Exterior grease traps shall not be placed within 5 feet of any portion of a building per COMM 82.34 2. Plumbing fixtures not meeting requirements of COMM82.33, table 82.33-1 shall be directly connected to the sanitary drain by means of a properly vented trap connection. 3. Floor sink receptors of indirect drains that are installed flush with the finished floor and are located in a commercial kitchen shall be directed to a grease interceptor per COMM 82.34 4. The State of Wisconsin requires a licensed plumber to make installation of plumbing, this includes plumbing fixtures per WSS 145 5. Chemical proportioners shall be labeled and comply with ASSE 1055 standards A or B as to water supply and use of wasting tee installations per COMM 82.41 6. Re-circulated hot water lines shall be insulated per COMM 82.40 7. Containment Reduced Zone Pressure Backflow protection valves are not required by code for this class of business. However, all points of water use in the building potable water system shall be cross-connection protected per COMM 82.41. In the event installation of this plumbing system has not commenced within two years from this date, this approval shall become void. A new application accompanied by full examination fees shall be filed and an updated approval received before work may commence. .. In granting this approval, the City of Oshkosh or its representative does not hold itself liable for any defects in plans or specifications, plan omissions, examination oversight, construction or any damage that may result in or after installation. The City of Oshkosh reserves the right to order changes or additions should conditions arise making this necessary. It shall be necessary for the installing plumber to obtain a plumbing permit from the City of Oshkosh before proceeding with actual installation of this plumbing system or any of its parts. Respectfu Ily, Richard Wood, Plumbing Inspector Nov 1~ 2006 10:27AM CMA .. 16123382995 p.2 PATRICK G. BLEES ARCHITECT Patrick G. Bless, AlA PATRIC~\. G. StEES ,~RC!-lITECT :lCiC! 8aiiey Avenue-, Suite 310 F;',irt Worth, Texas 7'5107-1210 Office (B17}877~Q44 Fax (817} 871-C41B PATRICK G. BLEES ARCHITECT 219 North Second Street, Suite 301 MInneapolis, Minnesota 55401-1454 Office (S12) 338-6677 Fax ((12) 338-2995 November 13~ 2006 Mr. Richard Wood Plumbing Inspector City of Oshkosh Inspection Services Division 215 Church Avenue Oshkosh, ~I54903-1130 RE: Buffalo Wild Wings - Plan Review Project No. 0611l-UI Dear Mr. ~ood: In order to expedite the installation of the grease interceptor for this project, please allow the Landlord's Plumbing Contractor to pick up the reviewed and marked up plans. They will bring them to the site, where they shall remain. They will also make copies ofthe set and send the copies to us so we are able to revise the drawings based upon your review comments. Please call if you have any questions. Sincerely, C.M. ARCIDTECTURE. P.A. Patrick G_ Blees, AIA PGBJjgn cc: [Keith Richters - BWW] [file] 06111-18 richwood !lImb 1l1306.doc