HomeMy WebLinkAboutPlumbing W2-224-1106-P
~
OJHKOJH
City of Oshkosh
Inspection Services
215 Church Ave., PO Box 1130
Oshkosh, WI 54902-1130
(920) 236-5052 (920) 236-5184 FAX
ON THE WATER
November 13, 2006
Patrick G. Blees Architect
219 North Second Street, Suite 301
Minneapolis, Minnesota 55401-1454
Ref: Plumbing Plan APproval:~~K~~rr~~~~~~~~L'1
"Plan ID#~~:'j5 iL'__'~~~'-
Dear Sirs,
Examination of the plumbing plans and specifications for this project has been completed. In
accord with Chapter 145, Wisconsin Statute, and COMM 81 through 85, Wisconsin
Administrative Code, the plumbing plans and specifications are approved contingent upon
compliance with the stipulation(s) noted below.
1. Exterior grease traps shall not be placed within 5 feet of any portion of a building per COMM
82.34
2. Plumbing fixtures not meeting requirements of COMM82.33, table 82.33-1 shall be directly
connected to the sanitary drain by means of a properly vented trap connection.
3. Floor sink receptors of indirect drains that are installed flush with the finished floor and are
located in a commercial kitchen shall be directed to a grease interceptor per COMM 82.34
4. The State of Wisconsin requires a licensed plumber to make installation of plumbing, this
includes plumbing fixtures per WSS 145
5. Chemical proportioners shall be labeled and comply with ASSE 1055 standards A or
B as to water supply and use of wasting tee installations per COMM 82.41
6. Re-circulated hot water lines shall be insulated per COMM 82.40
7. Containment Reduced Zone Pressure Backflow protection valves are not required
by code for this class of business. However, all points of water use in the building
potable water system shall be cross-connection protected per COMM 82.41.
In the event installation of this plumbing system has not commenced within two years from this
date, this approval shall become void. A new application accompanied by full examination
fees shall be filed and an updated approval received before work may commence.
..
In granting this approval, the City of Oshkosh or its representative does not hold itself liable for
any defects in plans or specifications, plan omissions, examination oversight, construction or
any damage that may result in or after installation. The City of Oshkosh reserves the right to
order changes or additions should conditions arise making this necessary.
It shall be necessary for the installing plumber to obtain a plumbing permit from the City of
Oshkosh before proceeding with actual installation of this plumbing system or any of its parts.
Respectfu Ily,
Richard Wood,
Plumbing Inspector
Nov 1~ 2006 10:27AM CMA
..
16123382995
p.2
PATRICK G. BLEES ARCHITECT
Patrick G. Bless, AlA
PATRIC~\. G. StEES ,~RC!-lITECT
:lCiC! 8aiiey Avenue-, Suite 310
F;',irt Worth, Texas 7'5107-1210
Office (B17}877~Q44
Fax (817} 871-C41B
PATRICK G. BLEES ARCHITECT
219 North Second Street, Suite 301
MInneapolis, Minnesota 55401-1454
Office (S12) 338-6677
Fax ((12) 338-2995
November 13~ 2006
Mr. Richard Wood
Plumbing Inspector
City of Oshkosh Inspection Services Division
215 Church Avenue
Oshkosh, ~I54903-1130
RE: Buffalo Wild Wings - Plan Review
Project No. 0611l-UI
Dear Mr. ~ood:
In order to expedite the installation of the grease interceptor for this project, please allow the Landlord's
Plumbing Contractor to pick up the reviewed and marked up plans. They will bring them to the site, where they
shall remain. They will also make copies ofthe set and send the copies to us so we are able to revise the drawings
based upon your review comments.
Please call if you have any questions.
Sincerely,
C.M. ARCIDTECTURE. P.A.
Patrick G_ Blees, AIA
PGBJjgn
cc: [Keith Richters - BWW]
[file]
06111-18 richwood !lImb 1l1306.doc