Loading...
HomeMy WebLinkAbout0123368-Building e OSHKOSH ON THE WATER Job Address 11 BROAD ST CITY OF OSHKOSH No 123368 BUILDING PERMIT - APPLICATION AND RECORD Owner CITY OF OSHKOSH Create Date 01/31/2007 Designer Contractor lEI GENERAL CONTRACTORS Category 262 - City of Oshkosh-Alteration Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. o Projection I Canopies Finished/Living Sq.Ft. Bedrooms Stories Signs Garage Sq.Ft. Baths Foundation 0 Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier . Other o Treated Wood Occupancy Permit Not Required Flood Plain Height Permit # Dwelling Units o # Structures o Park Dedication Use/Nature of Work IP;::~i. S""oo I Cut '0 'a_ wall OpeO'09' to< Comb",,",o AI' Lou",,",. ,oo"'" oow pad 10, DI.,., """"",t,,,.. S"""d & "'",e. HV AC Contractor UNKNOWN??? Plumbing Contractor Electric Contractor VAN ERT ELECTRIC CO INC Fees: Valuati $10,000.00 Plan Approval $0.00 Permit Fee Paid $0.00 Park Dedication $0.00 Issued By: Date 01/31/2007 Final/O.P. 00/00/0000 o Permit Voided I Parcel Id # 0800230000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address PO BOX 5067 Agent/Owner DE PERE WI 54115 - 5067 Telephone Number 337-2111 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.