Loading...
HomeMy WebLinkAbout2007-Plumbing e OSHKOSH ON THE WATER Job Address 420 MAIN ST CITY OF OSHKOSH No 123369 PLUMBING PERMIT - APPLICATION AND RECORD Owner D & M RENTALS LLC Create Date 01/31/2007 Category 440 - Industrial-Interior Plan Wait. St. Shamp Sink Coffee Maker Ice Chest Flr/Wst Sink Int Grease Trap Exam Sink Catch Basin Ext Grease Trap Sculry Sink Wash Ftn RPZ Valve Hand Sink Urinal Eye Wash Statn Plaster Sink Standp Rec Wtr Sewer Mtrs Surgeons Sink Ice Maker Deduct Meters F Prep Sink Gar Drain Wtr Usage Mtrs Serv Sink Soda Disp Contractor DR HANSEN PLBG. Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Valuation Issued By 2 Shower Water Softner Floor Drain Local Waste 2 Lndry Tray Clothes Wshr 2 Disposal 2 Bidet - - 2 Dishwasher 2 Beer Tap Sump Pump Lab Sink Classrm Sink Sterilizer Breakrm Sink Dip Well Ejector/Grind Drink Ftn Remodle second floor for 2 apartments. Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcel Id # 0400820000 $0.00 Permit Fees $112.00 D Permit Voided I Plan Approval Date 01/31/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner OSHKOSH WI 54902 - 0000 Telephone Number 233-1595 Address 55 KNAPP ST To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.