HomeMy WebLinkAbout0122631-Plumbing (interior)
o
OSHKOSH
ON THE WATER
Job Address 3630 STEARNS DR
CITY OF OSHKOSH No 122631
PLUMBING PERMIT - APPLICATION AND RECORD
Owner DANIEL E DOWLING Create Date 11/20/2006
Plan
Contractor GARTMAN MECHANICAL SERVICES
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature COMM/New 30,000 sf Distribution Warehouse. ""DEBIT ACCT"".
of Work
Shower
Floor Drain
4 Lndry Tray
4 Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
Water Softner
Local Waste
Clothes Wshr
Bidet
Beer Tap
Lab Sink
Sterilizer
Dip Well
Drink Ftn
Category 440 - Industrial-Interior
Wait. St.
Ice Chest
Exam Sink
Shamp Sink
FlrlWst Sink
Catch Basin
Wash Ftn
Urinal
Standp Rec
Ice Maker
Gar Drain
Soda Disp
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
Valuation
Issued By
Sanitary Sewer
Storm Sewer
Water Service
Size
Material
#
Conn. Type
Parcel Id #
1278800000
Type
$91.00 0 Permit Voided I
$8,400.00 Plan Approval _._____ $0.00 Permit Fees
~
Date 11/20/2006
In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Address 520 W SOUTH PARK AV
Agent/Owner
OSHKOSH
Date
WI 54902 - 0000 Telephone Number 920-231-5530
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.