Loading...
HomeMy WebLinkAbout0123336-Building (interior alteration) o OSHKOSH ON THE WATER Job Address 1014 OHIO ST CITY OF OSHKOSH No 123336 BUILDING PERMIT - APPLICATION AND RECORD Owner -FLUOR DEVELOPMENT I LLC Create Date 01/26/2007 Designer AEC William Aubrey Contractor FLUOR BROS CONSTRUCTION CO Category 205 - Alteration Amusement, Social, Recreation Plan X2-1884-0107 Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: 3B Size Sq.Ft. Sq. Ft. Sq. Ft. Rooms Height Ft. o Projection I Unfinished/Basement Finished/Living Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units o # Structures o Use/Nature Bar/ Interior alterations for bar / nightclub as per plans. of Work HV AC Contractor GARTMAN MECHANICAL SERVICES Plumbing Contractor M P KELLY Electric Contractor SOLAR ELECTRIC SERVICES INC Fees: Valuation 0.00 Plan Approval $0.00 Permit Fee Paid $616.00 Park Dedication $0.00 Issued By: Date 01/26/2007 Final/O.P. 00/00/0000 o Permit Voided I Parcelld # 1300220000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder( 0 see any ece a als before starting such activity. Signature I Date /-/6-tJ? Address Agent/Owner OSHKOSH WI 54902 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.