HomeMy WebLinkAbout0123336-Building (interior alteration)
o
OSHKOSH
ON THE WATER
Job Address 1014 OHIO ST
CITY OF OSHKOSH No 123336
BUILDING PERMIT - APPLICATION AND RECORD
Owner -FLUOR DEVELOPMENT I LLC Create Date 01/26/2007
Designer
AEC William Aubrey
Contractor FLUOR BROS CONSTRUCTION CO
Category
205 - Alteration Amusement, Social, Recreation
Plan X2-1884-0107
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const: 3B
Size
Sq.Ft.
Sq. Ft.
Sq. Ft.
Rooms
Height
Ft.
o Projection I
Unfinished/Basement
Finished/Living
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units
o
# Structures
o
Use/Nature Bar/ Interior alterations for bar / nightclub as per plans.
of Work
HV AC Contractor
GARTMAN MECHANICAL SERVICES
Plumbing Contractor M P KELLY
Electric Contractor SOLAR ELECTRIC SERVICES INC
Fees: Valuation
0.00 Plan Approval
$0.00 Permit Fee Paid
$616.00 Park Dedication
$0.00
Issued By:
Date 01/26/2007
Final/O.P. 00/00/0000
o Permit Voided I
Parcelld # 1300220000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder( 0 see any ece a als before starting such activity.
Signature I
Date
/-/6-tJ?
Address
Agent/Owner
OSHKOSH
WI 54902 - 0000
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.