Loading...
HomeMy WebLinkAbout0123308-Building o OSHKOSH ON THE WATER Job Address 500-550 S KOELLER ST CITY OF OSHKOSH No 123308 BUILDING PERMIT - APPLICATION AND RECORD Owner RIVER VALLEY ONE LLC Create Date 01/25/2007 Contractor R J ALBRIGHT INC. Designer Category 232 - Alteration Stores & Customer Service Plan X1-1878-0107 Type . Building o Sign o Canopy o Fence o Raze Zoning C2 Class of Const: VBibc Size Height Stories 1 Ft. o Projection I Unfinished/Basement Sq. Ft. Rooms Finished/Living 3009 Sq. Ft. Sq.Ft. Bedrooms Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Required Park Dedication Flood Plain Height Permit # Dwelling Units o # Structures 0 Use/Nature 550 S Koeller /Interior improvements to create Vanilla Box with restrooms for future Tenant Improvements. of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $48,000.00 Plan Approval Issued By: ~ - $0.00 Permit Fee Paid $232.00 Park Dedication $0.00 Date 01/26/2007 Final/O.P. 00/00/0000 o Permit Voided I Parcelld # 0611620000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to ny n cessa approvals before s Date 1&6/0/ I / Signature Address 5711 GREEN VALLEY RD Agent/Owner OSHKOSH WI 54904 - 0000 Telephone Number 231-8635 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.