Loading...
HomeMy WebLinkAbout0123267-Plumbing (water heater) . OSHKOSH ON THE WATER Job Address 702 W 11 TH AVE CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner ANNE M HIBBARD Contractor SAMMONS PLUMBING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Category 411 - Residential-Water Heaters Water Sottner Wait. St. Shamp Sink Local Waste Ice Chest FlrlWst Sink Clothes Wshr Exam Sink Catch Basin Bidet Sculry Sink Wash Ftn Beer Tap Hand Sink Urinal Lab Sink Plaster Sink Standp Rec Sterilizer Surgeons Sink Ice Maker Dip Well F Prep Sink Gar Drain Drink Ftn Serv Sink Soda Disp No 123267 Create Date 01/22/2007 Plan Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs SFRI Replace gas water heater. **DEBIT ACCT**. Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1303880000 Valuation $600.00 Plan Approval Issued By (Ynvo $0.00 Permit Fees $25.00 D Permit Voided I Date 01/22/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform. the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Agent/Owner OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 Address 522 W. MURDOCK AVE Date To schedule inspections please call the Inspection Request line at 23~-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.