Loading...
HomeMy WebLinkAbout0123222-Building (roofing/siding/windows) G OSHKOSH ON THE WATER Job Address 613 FREDERICK ST CITY OF OSHKOSH No 123222 BUILDING PERMIT.. APPLICATION AND RECORD Owner NU VIEW PROPERTIES LLC Create Date 01/18/2007 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Sq. Ft. Sq. Ft. Rooms Height Ft. D Projection I Canopies Finished/Living Bedrooms Stories Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Flood Plain Height Permit # Dwelling Units o # Structures o Park Dedication Use/Nature of Work Duplex/LATE Permit! Reroofing, residing and replacing windows on the house. This house is currently posted unfit and the new owner ( Nu- View Properties) is starting repairs to make the building saleable and habitable. Any further repairs or remodeling wil require seperate permits. HV AC Contractor Plumbing Contractor Electric Contractor $7,500.00 Plan Approval $0.00 Permit Fee Paid $74.00 Park Dedication $0.00 Fees: Valuation Issued By: ~ Date 01/18/2007 Final/O.P. 00/00/0000 D Permit Voided I Parcel Id # 0703590000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no thority to enforce easement restrictions of which it is not a party, if you perform the work described' is permit plicatio in an easement, the City strongly urges the permit applicant to contact the easement holder(s) and secure nece a approvals before starting such activity. Signature Date .--<. l/18/C 7 t . Address 4768 BAYVIEW LN Agent!Owner OSHKOSH WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the requesJ is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.