HomeMy WebLinkAbout0123234-Plumbing (water heater)
e
OSHKOSH
ON THE WATER
Job Address 160 W WAUKAU AVE
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner EUGENE L TREICHEL
Contractor FARMERS SUPPLY CO
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
of Work
Category 441 - Industrial-Water Heaters
No 123234
Create Date 01/19/2007
Plan
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Replace electric water heater
Size Material Type # Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcel Id #
1413330000
Valuation
Shower Water Softner Wait. St. Shamp Sink
FloorDrain Local Waste Ice Chest FlrlWst Sink
Lndry Tray Clothes Wshr Exam Sink Catch Basin
Disposal Bidet Sculry Sink Wash Ftn
Dishwasher Beer Tap Hand Sink Urinal
Sump Pump Lab Sink Plaster Sink Standp Rec
Classrm Sink Sterilizer Surgeons Sink Ice Maker
Breakrm Sink Dip Well F Prep Sink Gar Drain
Ejector/Grind Drink Ftn Serv Sink Soda Disp
$600.00 Plan Approval
$0.00 Permit Fees
$25.00 0 Permit Voided I
Issued By Date 01/19/2007
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
, v
Signature -;fc--/ ~~""7 Date / - /rt/ 7
Agent/Owner
Address 34 W 7TH AVE
OSHKOSH
WI 54902 - 0000 Telephone Number 235-6970
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.