Loading...
HomeMy WebLinkAboutCampbell Creek Amendment #2 ~sa. STRANO ASSOCIATES, INC.' ENGINEERS 910 WestWingra Drive Madison, WI 53715 Phone: 608-251-4843 Fax: 608-251-8655 Office Locations Madison, WI Joliet, IL Lexington, KY Louisville, KY Mobile, AL Columbus, IN Lancaster, OH Indianapolis, IN Milwaukee, WI Cincinnati, OH www.strand.com RECEIVED I tJAN 1 7 2006 . DEPT. OF PUBliC WORKS I ()~Hlm~H Wlgr.()N~li\I ~...-"..-,._.-". .,.,.,.~ Transmittal Letter To: David Patek, P. E. City of Oshkosh 215 Church Street, PO Box 1130 Oshkosh,VVI54903-1130 Date: January 16, 2006 I Project No.: 11-382.021 Attention: RE: Campbell Creek Stormwater Plan - Amendment NO.2 WE ARE SENDING YOU: l:8J Attached D Under Separate Cover D Shop Drawings D Change Order D Copy of Letter D Specifications D Drawings D Samples D Other: Copies Date No. Description 2 Campbell Creek Stormwater Plan - Amendment No.2 for siqnature THESE ARE TRANSMITTED as checked below: D For approval D For your use D As requested o For review and comment Remarks: D Approved as submitted 0 Resubmit _ copies for approval o Approved as noted D Submit _ copies for distribution D Returned for corrections D Return _ corrected prints l:8J Other Please sign, date and return one copy to our office. f - J<( - 20Db --,-;; ~ L. 'tN\~.J- .(A6>>\ D~J p+ Copy to: c.<:. Document1 1~~c~d l~J ~ >O~d O"j;.Jlt yv D.h~. Signed: 6.5~k( Wi#. Ot.:rJ>) ~b A~ (UI)fl. Cof~) J)fk eAAA (tMh Cf~) sa STRANO ASSOCIATES,INGo!> ENGINEERS 910 West Wingra Drive Madison, WI 53715 Phone: 608-251-4843 Fax: 608-251-8655 Office Locations Madison, WI Joliet. IL Louisville, KY Lexington, KY Mobile, AL Columbus, IN Lancaster, OH Indianapolis, IN Milwaukee, WI www.strand.com January 16,2006 City of Oshkosh 215 Church Avenue Oshkosh, WI 54903-1130 Attention: David Patek, P.E., Director of Public Works Re: Agreement for Planning Services-Amendment No.2 North Branch Campbell Creek Stormwater Management Plan This is Amendment No.2 to the referenced Agreement for Planning Services dated May 26, 2005. ADD under Scope of Services: A. Topographic Survey "4. ENGINEER shall perform field survey of Westfield Drive, the Landmark Plaza Site, and the Tippler Jr. High School Site in areas that currently appear to flood east of Landmark Plaza. Survey will include structures, low areas, overflow elevations, and other points of hydrologic relevance." D. Analysis of potential impacts of future development on existing drainage system. "6. Alternative 6 - Analysis of the effect of removing the proposed detention basin directly south of Landmark Plaza, detention at the Armory and at 9th StreetlW ashburn, removing the diversion pipe under HWY 41, and increasing the storage capacity (as a dry detention basin) at the Tippler Jr. High School Site. This will also include analysis of an overflow route east of Landmark Plaza to the Tippler Jr. High detention basin and sizing of a 100- year storm sewer in the DOT right-of-way downstream of the diversion to Landmark Plaza. 7. Alternative 7 - Analysis of the effect of removing the proposed detention basin directly south of Landmark Plaza, detention at the Armory and at 9th Street/Washburn, leaving the diversion pipe under HWY 41 intact, and increasing the storage capacity (as a dry detention basin) at the Tippler Jr. High School Site. This will also include analysis of an overflow route east of Landmark Plaza to the Tippler Jr. High detention basin. 8. Alternative 8 - Analysis of the effect of removing the proposed detention basin directly south of Landmark Plaza, detention at the Armory and at 9th S treet/W ashburn, removing the diversion pipe under HWY 41, increasing the storage capacity (as a dry detention basin) at the Tippler Jr. High School sa STRANO ASSOCIATES,ING<!I ENGINEERS City of Oshkosh Page 2 January 16, 2006 Site, and expansion of the Westhaven Golf Course Detention Pond. This will also include analysis of an overflow route east of Landmark Plaza to the Tippler Jr. High detention basin and sizing of a 100-year storm sewer in the DOT right-of-way downstream of the diversion to Landmark Plaza. 9. Alternative 9 - Analysis of the effect of removing the proposed detention basin directly south of Landmark Plaza, detention at the Armory and at 9th Street/Washburn, leaving the diversion pipe under HWY 41 intact, increasing the storage capacity (as a dry detention basin) at the Tippler Jr. High School Site, and expansion of the Westhaven Golf Course Detention Pond. This will also include analysis of an overflow route east of Landmark Plaza to the Tippler Jr. High detention basin. 10. Alternative 10 - Analysis of the effect of removing the proposed detention basin directly south of Landmark Plaza, detention at the Armory, no detention at 9th Street/Washburn, removing the diversion pipe under HWY 41, increasing the storage capacity (as a dry detention basin) at the Tippler Jr. High School Site, and expansion of the Westhaven Golf Course Detention Pond. This will also include analysis of an overflow route east of Landmark Plaza to the Tippler Jr. High detention basin and sizing of a 100-year storm sewer in the DOT right-of-way downstream of the diversion to Landmark Plaza. 11. Alternative 11 - Analysis of the effect of removing the proposed detention basin directly south of Landmark Plaza, detention at the Armory, no detention at 9th Street/Washburn, leaving the diversion pipe under HWY 41 intact, increasing the storage capacity (as a dry detention basin) at the Tippler Jr. High School Site, and expansion of the Westhaven Golf Course Detention Pond. This will also include analysis of an overflow route east of Landmark Plaza to the Tippler Jr. High detention basin. 12. Single analysis of pipe sizes to convey the 10-year storm on the North Branch Main Line downstream of Landmark Plaza and the Main Stem to Campbell Creek with the recommended alternative in place. 13. Pipe capacity analysis of the entire modeled system to show the pipe capacity according to design storm in a GIS figure with the recommended alternative in place. 14. Analysis and a GIS figure showing the changes in diversion at Diversion Points 1, 2, and 3 with the recommended alternative in place." 1-382-021 \JHL:nep\R:\W ordp\Agreements]roject Specific\Amendmellts\City of Oshkosh.Anmd No.2.doc sa STRANO ASSOCIATES.INC,<l> ENGINEERS City of Oshkosh Page 3 January 16, 2006 CHANGE under Compensation the lump sum fee from $35,000 to "$59,900." Replace table with the following: Topographical Survey Meetings Stormwater Modeling! Analysis Stormwater Management Plan Total $ 6,300 4,000 34,400 15.200 $59,900 ADD under Schedule: The final plan incorporating the Scope of Services herein will be completed approximately 2 1/2 months after Amendment No.2 is signed. IN WITNESS WHEREOF the parties hereto have made and executed this Amendment. ENGINEER: STRAND ASSOCIATES, INC. ~JIE/~ /ft~/t)~ , mte F"gger H H)l~hth~l1<::f>n -.corporate- Secretary' , MA-H-~.f. R.4w1s A-S$;S.f~.} C01orJ-J;.. 5-e.c. ",.e.J.o.."y OWNER: CITY OF OSHKOSH '/4~ Richard W ollangk City Manager /-17-;!~ Date /l~,~ -Knd-- City Clerk I bt.fuJ:y f'11/0~ Date to L-rv--J) (J. ~ Edward A. Nokes Finance Director fIn /o~ Date oft Atto;"ey 1-382-021 'JHL:nep\R:\W ordplAgreements ]roject SpecificlAmendments\City ofOshkosh.Amnd No.2.doc