HomeMy WebLinkAboutCampbell Creek Amendment #2
~sa.
STRANO
ASSOCIATES, INC.'
ENGINEERS
910 WestWingra Drive
Madison, WI 53715
Phone: 608-251-4843
Fax: 608-251-8655
Office Locations
Madison, WI
Joliet, IL
Lexington, KY
Louisville, KY
Mobile, AL
Columbus, IN
Lancaster, OH
Indianapolis, IN
Milwaukee, WI
Cincinnati, OH
www.strand.com
RECEIVED
I tJAN 1 7 2006
. DEPT. OF PUBliC WORKS
I ()~Hlm~H Wlgr.()N~li\I
~...-"..-,._.-". .,.,.,.~
Transmittal Letter
To: David Patek, P. E.
City of Oshkosh
215 Church Street, PO Box 1130
Oshkosh,VVI54903-1130
Date: January 16, 2006 I Project No.: 11-382.021
Attention:
RE: Campbell Creek Stormwater Plan - Amendment NO.2
WE ARE SENDING YOU:
l:8J Attached
D Under Separate Cover
D Shop Drawings
D Change Order
D Copy of Letter
D Specifications
D Drawings
D Samples
D Other:
Copies Date No. Description
2 Campbell Creek Stormwater Plan - Amendment No.2 for siqnature
THESE ARE TRANSMITTED as checked below:
D For approval
D For your use
D As requested
o For review and comment
Remarks:
D Approved as submitted 0 Resubmit _ copies for approval
o Approved as noted D Submit _ copies for distribution
D Returned for corrections D Return _ corrected prints
l:8J Other Please sign, date and return one copy to our office.
f - J<( - 20Db
--,-;; ~ L. 'tN\~.J-
.(A6>>\ D~J p+
Copy to:
c.<:.
Document1
1~~c~d l~J ~ >O~d
O"j;.Jlt yv D.h~.
Signed:
6.5~k( Wi#. Ot.:rJ>)
~b A~ (UI)fl. Cof~)
J)fk eAAA (tMh Cf~)
sa
STRANO
ASSOCIATES,INGo!>
ENGINEERS
910 West Wingra Drive
Madison, WI 53715
Phone: 608-251-4843
Fax: 608-251-8655
Office Locations
Madison, WI
Joliet. IL
Louisville, KY
Lexington, KY
Mobile, AL
Columbus, IN
Lancaster, OH
Indianapolis, IN
Milwaukee, WI
www.strand.com
January 16,2006
City of Oshkosh
215 Church Avenue
Oshkosh, WI 54903-1130
Attention:
David Patek, P.E., Director of Public Works
Re: Agreement for Planning Services-Amendment No.2
North Branch Campbell Creek Stormwater Management Plan
This is Amendment No.2 to the referenced Agreement for Planning Services dated May 26,
2005.
ADD under Scope of Services:
A. Topographic Survey
"4. ENGINEER shall perform field survey of Westfield Drive, the Landmark
Plaza Site, and the Tippler Jr. High School Site in areas that currently appear
to flood east of Landmark Plaza. Survey will include structures, low areas,
overflow elevations, and other points of hydrologic relevance."
D. Analysis of potential impacts of future development on existing drainage system.
"6. Alternative 6 - Analysis of the effect of removing the proposed detention
basin directly south of Landmark Plaza, detention at the Armory and at
9th StreetlW ashburn, removing the diversion pipe under HWY 41, and
increasing the storage capacity (as a dry detention basin) at the Tippler Jr.
High School Site. This will also include analysis of an overflow route east of
Landmark Plaza to the Tippler Jr. High detention basin and sizing of a 100-
year storm sewer in the DOT right-of-way downstream of the diversion to
Landmark Plaza.
7. Alternative 7 - Analysis of the effect of removing the proposed detention
basin directly south of Landmark Plaza, detention at the Armory and at
9th Street/Washburn, leaving the diversion pipe under HWY 41 intact, and
increasing the storage capacity (as a dry detention basin) at the Tippler Jr.
High School Site. This will also include analysis of an overflow route east of
Landmark Plaza to the Tippler Jr. High detention basin.
8. Alternative 8 - Analysis of the effect of removing the proposed detention
basin directly south of Landmark Plaza, detention at the Armory and at
9th S treet/W ashburn, removing the diversion pipe under HWY 41, increasing
the storage capacity (as a dry detention basin) at the Tippler Jr. High School
sa
STRANO
ASSOCIATES,ING<!I
ENGINEERS
City of Oshkosh
Page 2
January 16, 2006
Site, and expansion of the Westhaven Golf Course Detention Pond. This will
also include analysis of an overflow route east of Landmark Plaza to the
Tippler Jr. High detention basin and sizing of a 100-year storm sewer in the
DOT right-of-way downstream of the diversion to Landmark Plaza.
9. Alternative 9 - Analysis of the effect of removing the proposed detention
basin directly south of Landmark Plaza, detention at the Armory and at
9th Street/Washburn, leaving the diversion pipe under HWY 41 intact,
increasing the storage capacity (as a dry detention basin) at the Tippler Jr.
High School Site, and expansion of the Westhaven Golf Course Detention
Pond. This will also include analysis of an overflow route east of Landmark
Plaza to the Tippler Jr. High detention basin.
10. Alternative 10 - Analysis of the effect of removing the proposed detention
basin directly south of Landmark Plaza, detention at the Armory, no
detention at 9th Street/Washburn, removing the diversion pipe under HWY
41, increasing the storage capacity (as a dry detention basin) at the Tippler
Jr. High School Site, and expansion of the Westhaven Golf Course Detention
Pond. This will also include analysis of an overflow route east of Landmark
Plaza to the Tippler Jr. High detention basin and sizing of a 100-year storm
sewer in the DOT right-of-way downstream of the diversion to Landmark
Plaza.
11. Alternative 11 - Analysis of the effect of removing the proposed detention
basin directly south of Landmark Plaza, detention at the Armory, no
detention at 9th Street/Washburn, leaving the diversion pipe under HWY 41
intact, increasing the storage capacity (as a dry detention basin) at the
Tippler Jr. High School Site, and expansion of the Westhaven Golf Course
Detention Pond. This will also include analysis of an overflow route east of
Landmark Plaza to the Tippler Jr. High detention basin.
12. Single analysis of pipe sizes to convey the 10-year storm on the North
Branch Main Line downstream of Landmark Plaza and the Main Stem to
Campbell Creek with the recommended alternative in place.
13. Pipe capacity analysis of the entire modeled system to show the pipe
capacity according to design storm in a GIS figure with the recommended
alternative in place.
14. Analysis and a GIS figure showing the changes in diversion at Diversion
Points 1, 2, and 3 with the recommended alternative in place."
1-382-021 \JHL:nep\R:\W ordp\Agreements]roject Specific\Amendmellts\City of Oshkosh.Anmd No.2.doc
sa
STRANO
ASSOCIATES.INC,<l>
ENGINEERS
City of Oshkosh
Page 3
January 16, 2006
CHANGE under Compensation the lump sum fee from $35,000 to "$59,900."
Replace table with the following:
Topographical Survey
Meetings
Stormwater Modeling! Analysis
Stormwater Management Plan
Total
$ 6,300
4,000
34,400
15.200
$59,900
ADD under Schedule: The final plan incorporating the Scope of Services herein will be
completed approximately 2 1/2 months after Amendment No.2 is signed.
IN WITNESS WHEREOF the parties hereto have made and executed this Amendment.
ENGINEER:
STRAND ASSOCIATES, INC.
~JIE/~
/ft~/t)~
, mte
F"gger H H)l~hth~l1<::f>n
-.corporate- Secretary' ,
MA-H-~.f. R.4w1s
A-S$;S.f~.} C01orJ-J;.. 5-e.c. ",.e.J.o.."y
OWNER:
CITY OF OSHKOSH
'/4~
Richard W ollangk
City Manager
/-17-;!~
Date
/l~,~ -Knd--
City Clerk I bt.fuJ:y
f'11/0~
Date
to L-rv--J) (J. ~
Edward A. Nokes
Finance Director
fIn /o~
Date
oft Atto;"ey