HomeMy WebLinkAboutPW CNT 06-06/Cng Ord #1
TO: Fischer-:Ulman Construction, Inc.
1115 S. Theodore Street
Appleton, WI 54915
Your presentcontract withthe City of Oshkosh, Contract No.
and changed as follows:
.06-06
NET INCREASE TO SECTION 1- SIDEWALK REHAB:
I certify that provision has been madeto pay the liability that will accrue to theCity of
Oshkosh, Wisconsin, under the within Change Order.
-' '~
CONTRACT: 06-b6CHANGE ORDER#1
ITEM DECREASE IN
NUMBER DESCRIPTION CONTRACT
Pf/lCE
Approx. 57,500 square feet
of sidewalk removal &
driveway removal,
complete as specified, per
s uare foot 57,500.00 74,233.70 16,733.70 $0.31 $5,187.45
2 Approx. 5,500 linear feet of
concrete/asphalt sawing,
complete as specified, per
linear foot 5,500.00 5,648.00 148.00 $2.50 $370.00
3 Construct approx. 65,500
square feet of 4" thick
concrete sidewalk in
various locations in the
City of Oshkosh,complete
as specified, per square
foot 65,500.00 64,631.80 -868.20 $2.52 ($2,187.86)
4 Construct approx. 15,000
square feet.of 6" thick
concrete sidewalk in
various locations in the
Cityof Oshkosh, complete
as specified, per square
foot 15,000.00 13,293.93 -1,706.07 $3.00 ($5,118.21)
5 Construct approx. 2,500
square feet of 7"thick
crosswalk areas,. complete
as specified, per square
foot 2,500.00 6,898.71 4,398.71 $3.25 $14,295.81
6 Provide andinstall approx.
250 square feet of metal
detectable warning plates,
complete as specified, per
s uare foot 250.00 512.00 262.00 $32.00 $8,384.00
7 Approx. 2,000 square feet
of three (3") inch asphalt
replacement, complete as
s ecified, ers uarefoot 2,000.00 2,238.64 238.64 $3.30 $787.51
Approx. 300 linear feet of
curb and gutter removal,
complete as specified, per
linear foot 300.00 995.50 695.50 $3.80 $2,642.90
9 Approx.350 linear feet of
30" curb and gutter,
complete as specified, per
linear foot 350.00 995.50 645.50 $16.80 $10,844.40
10 Approx. 1 ,200 square
yards of terrace
restoration, including seed,
fertilize, and mulch,
complete as specified., per
s uare ard
.. ',.;'.-,,:~;,<"";'';;'.:' ,''';':;' -
4... ~
ITEM COST PER
NUMBER UNIT
11 Furnish andinstallapprox.
50 pavement ties,
complete as specified,
each 50.00 250.00 200.00 $7.00 $1,400.00
12 Construct approx. 4,000
square feet of 4" thick
concrete sidewalk in Water
Dept. repair locations at
approx.60 sites, complete
as specified, per square
foot 4,000.00 2,465.70 -1,534.30 $3.95 ($6,060.49)
13 Construct approx.1 ,000
square feet of 6" thick
concrete sidewalk in Water
Dept. repair locations at
approx. 20 sites, complete
as specified, per square
foot 1,000.00 659.37 -340.63 $4.00
14 Approx. 100 square yards
of 7" non-reinforced
concrete. pavement
remov"lI and replacement,
including sawing,
pavement ties, integral
curb & grading, \erracing &
traffic control, complete as
specified, per square yard
100.00 135.25 35.25 $1,339.50
15 Approx. 1 ,800 square
yards of 8" non-reinforced
concrete pavement
removal and replacement,
including sawing,
pavement ties, integral
curb & grading, terracing &
traffic control, complete as
specified, per square yard
1,800.00 814.65 -985.35 $37.90 ($~17 ,344.77)
16 Approx. 100 square yards
of 8" special High Early
Strength, non-
reinforced concrete
pavement removal and
replacement, including
sawing, pavement ties,
integral curb and grading,
terracing and traffic control,
complete as specified, per
s ua 100.00 107.53 7.53 $43.00 $323.79
17 Approx. 250 tons extra
crushed stone base,
complete as specified, per
ton $11.25
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
DESCRIPTION CONTRACT CONTRACT
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE
18 Approx. 1 ,200 linear feet of
No.4 epoxy-coated
reinforcement rods,
installed as specified, per
lineat foot 1,200.00 238.00 -962.00 $1.00 ($962.00)
19 Furnish, install and
maintain Type "C" Inlet
protection in approx. 20
locations, complete as
s ecified, each 20.00 13.00 -7.00 $35.00 ($245.00)
20 Provide $1,500 to the City
of Oshkosh for project
management
communications, complete
as specified, lump sum
1.00
$47,079.56 ($54,303.14)
Iit~ ..,
DESCRIPTION
8"/7 bag non-
reinforced concrete
pavement removal
and replacement,
including sawing,
pavement ties, integral
curb & grading,
terracing & traffic
control, complete as
specified, per square
yard
828.70
828.70
$42.00
$34,805.40
2 9"/7 bag non-
reinforced concrete
pavement removal
and replacement,
including sawing,
pavement ties, integral
curb & grading,
terracing & traffic
control, complete as
specified, per square
yard
,..,.
.. . > ..... ,.. ... . .. < ... .., < . ,- .' - ", - .. .,'., ~ " ...' ,'..',.... """ ,':
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT
. PRICE PRICE
. 3 9"/9 bag non-
reinforced concrete
pavement removal
and replacement,
including sawing,
pavementties, integral I>
curb & grading,
terracing & traffic
control, complete as
specified, per square .....
yard
.. 31.27 31.27 $48.12 $1,504.71
4 6" -12" curb
differential, per lineal
foot 613.60 613.60 $2.57 $1,576.95
5 .<
Repaii-ladjust inlet (two
locations ),lumDsum 1.00 1.00 $175.00 $175.00
6 Repair/adjust manhole .
(one location), lump
sum 1.00 1.00 $100.00 $100.00
7 Erosion control mat,
Der sa. vd. 477.32 477.32 $2.05 $978.51
8 Epoxy sidewalk (one I..
location), lumD sum 1.00 1.00 $25.00 $25.00
9 Remove/replace
driveway at 1095
Zacher Drive, lump ..
sum 1.00 1.00 $3,030.21 $3,030.21
10 7 -bag/6" mix . .
concrete, per square
foot 2,602.00 2,602.00 $3.32 $8,638.64
11 Sidewalk curb, per
...
linear foot 21.50 21.50 $12.50 $268.75
12 9-bag mix concrete, 4';
sidewalk, per square
foot .. 50.00 50.00 . $2.85 $142.50
13 9-bag mix concrete, 6"
sidewalk, per square
foot 153.00 153.00 $4,27 $653.31
14 Delivery charge, lump
sum 1.00 1.00 $250.00 . $250.00
15 7-bagmix concrete,
7", Der sa. ft.. ... .. 1,472.50 1,472.50 $3.87 $5,698.58
16 Remove curb at 1015 ,
.. Washburn St., per Iin.
ft. .. 12.00 12.00 $6.00 $72.00
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT
PRICE PRICE
17 Replace curb at 1015
Washburn S1., per Iin.
f1. 6.00 6.00 $10.50 $63.00
18 Asphalt removal, per
s . ft. 1,657.98 1,657.98 $0.31 $513.97
19 Sod removal/clay
re lacement 8r hour 15.00 15.00 $125.00
ADDITIONAL WORK: C.O. #1 -(ITEMS 1 -19)- SUB-TOTAL $74,693.19 $0.00
NET INCREASE TO CONTRACT