HomeMy WebLinkAboutPW CNT 06-06/Cng Ord #1 TO: Fischer-:Ulman Construction, Inc. 1115 S. Theodore Street Appleton, WI 54915 Your presentcontract withthe City of Oshkosh, Contract No. and changed as follows: .06-06 NET INCREASE TO SECTION 1- SIDEWALK REHAB: I certify that provision has been madeto pay the liability that will accrue to theCity of Oshkosh, Wisconsin, under the within Change Order. -' '~ CONTRACT: 06-b6CHANGE ORDER#1 ITEM DECREASE IN NUMBER DESCRIPTION CONTRACT Pf/lCE Approx. 57,500 square feet of sidewalk removal & driveway removal, complete as specified, per s uare foot 57,500.00 74,233.70 16,733.70 $0.31 $5,187.45 2 Approx. 5,500 linear feet of concrete/asphalt sawing, complete as specified, per linear foot 5,500.00 5,648.00 148.00 $2.50 $370.00 3 Construct approx. 65,500 square feet of 4" thick concrete sidewalk in various locations in the City of Oshkosh,complete as specified, per square foot 65,500.00 64,631.80 -868.20 $2.52 ($2,187.86) 4 Construct approx. 15,000 square feet.of 6" thick concrete sidewalk in various locations in the Cityof Oshkosh, complete as specified, per square foot 15,000.00 13,293.93 -1,706.07 $3.00 ($5,118.21) 5 Construct approx. 2,500 square feet of 7"thick crosswalk areas,. complete as specified, per square foot 2,500.00 6,898.71 4,398.71 $3.25 $14,295.81 6 Provide andinstall approx. 250 square feet of metal detectable warning plates, complete as specified, per s uare foot 250.00 512.00 262.00 $32.00 $8,384.00 7 Approx. 2,000 square feet of three (3") inch asphalt replacement, complete as s ecified, ers uarefoot 2,000.00 2,238.64 238.64 $3.30 $787.51 Approx. 300 linear feet of curb and gutter removal, complete as specified, per linear foot 300.00 995.50 695.50 $3.80 $2,642.90 9 Approx.350 linear feet of 30" curb and gutter, complete as specified, per linear foot 350.00 995.50 645.50 $16.80 $10,844.40 10 Approx. 1 ,200 square yards of terrace restoration, including seed, fertilize, and mulch, complete as specified., per s uare ard .. ',.;'.-,,:~;,<"";'';;'.:' ,''';':;' - 4... ~ ITEM COST PER NUMBER UNIT 11 Furnish andinstallapprox. 50 pavement ties, complete as specified, each 50.00 250.00 200.00 $7.00 $1,400.00 12 Construct approx. 4,000 square feet of 4" thick concrete sidewalk in Water Dept. repair locations at approx.60 sites, complete as specified, per square foot 4,000.00 2,465.70 -1,534.30 $3.95 ($6,060.49) 13 Construct approx.1 ,000 square feet of 6" thick concrete sidewalk in Water Dept. repair locations at approx. 20 sites, complete as specified, per square foot 1,000.00 659.37 -340.63 $4.00 14 Approx. 100 square yards of 7" non-reinforced concrete. pavement remov"lI and replacement, including sawing, pavement ties, integral curb & grading, \erracing & traffic control, complete as specified, per square yard 100.00 135.25 35.25 $1,339.50 15 Approx. 1 ,800 square yards of 8" non-reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb & grading, terracing & traffic control, complete as specified, per square yard 1,800.00 814.65 -985.35 $37.90 ($~17 ,344.77) 16 Approx. 100 square yards of 8" special High Early Strength, non- reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb and grading, terracing and traffic control, complete as specified, per s ua 100.00 107.53 7.53 $43.00 $323.79 17 Approx. 250 tons extra crushed stone base, complete as specified, per ton $11.25 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 18 Approx. 1 ,200 linear feet of No.4 epoxy-coated reinforcement rods, installed as specified, per lineat foot 1,200.00 238.00 -962.00 $1.00 ($962.00) 19 Furnish, install and maintain Type "C" Inlet protection in approx. 20 locations, complete as s ecified, each 20.00 13.00 -7.00 $35.00 ($245.00) 20 Provide $1,500 to the City of Oshkosh for project management communications, complete as specified, lump sum 1.00 $47,079.56 ($54,303.14) Iit~ .., DESCRIPTION 8"/7 bag non- reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb & grading, terracing & traffic control, complete as specified, per square yard 828.70 828.70 $42.00 $34,805.40 2 9"/7 bag non- reinforced concrete pavement removal and replacement, including sawing, pavement ties, integral curb & grading, terracing & traffic control, complete as specified, per square yard ,..,. .. . > ..... ,.. ... . .. < ... .., < . ,- .' - ", - .. .,'., ~ " ...' ,'..',.... """ ,': ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT . PRICE PRICE . 3 9"/9 bag non- reinforced concrete pavement removal and replacement, including sawing, pavementties, integral I> curb & grading, terracing & traffic control, complete as specified, per square ..... yard .. 31.27 31.27 $48.12 $1,504.71 4 6" -12" curb differential, per lineal foot 613.60 613.60 $2.57 $1,576.95 5 .< Repaii-ladjust inlet (two locations ),lumDsum 1.00 1.00 $175.00 $175.00 6 Repair/adjust manhole . (one location), lump sum 1.00 1.00 $100.00 $100.00 7 Erosion control mat, Der sa. vd. 477.32 477.32 $2.05 $978.51 8 Epoxy sidewalk (one I.. location), lumD sum 1.00 1.00 $25.00 $25.00 9 Remove/replace driveway at 1095 Zacher Drive, lump .. sum 1.00 1.00 $3,030.21 $3,030.21 10 7 -bag/6" mix . . concrete, per square foot 2,602.00 2,602.00 $3.32 $8,638.64 11 Sidewalk curb, per ... linear foot 21.50 21.50 $12.50 $268.75 12 9-bag mix concrete, 4'; sidewalk, per square foot .. 50.00 50.00 . $2.85 $142.50 13 9-bag mix concrete, 6" sidewalk, per square foot 153.00 153.00 $4,27 $653.31 14 Delivery charge, lump sum 1.00 1.00 $250.00 . $250.00 15 7-bagmix concrete, 7", Der sa. ft.. ... .. 1,472.50 1,472.50 $3.87 $5,698.58 16 Remove curb at 1015 , .. Washburn St., per Iin. ft. .. 12.00 12.00 $6.00 $72.00 ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 17 Replace curb at 1015 Washburn S1., per Iin. f1. 6.00 6.00 $10.50 $63.00 18 Asphalt removal, per s . ft. 1,657.98 1,657.98 $0.31 $513.97 19 Sod removal/clay re lacement 8r hour 15.00 15.00 $125.00 ADDITIONAL WORK: C.O. #1 -(ITEMS 1 -19)- SUB-TOTAL $74,693.19 $0.00 NET INCREASE TO CONTRACT ,,"' , . .,_.