HomeMy WebLinkAboutPW CNT 06-05/Cng Ord #1 ,-,,1 ~~~, ,\ CHANGE ORDER # 1 DATED: September 15, 2006 TO: LaLonde Contractors, Inc. P. O. Box 070420 Milwaukee, WI 53207-0420 Your present contract with the City of Oshkosh, Contract No. and changed as follows: 06-05 , is hereby amended NET INCREASE TO: ADDITIONAL WORK: SECTION I NET INCREASE TO: ADDITIONAL WORK: SECTION IV $4,654.92 $101,471.09 NET INCREASE TO CONTRACT: $106,126.01 h<.vJ c.. ~L Director of Pu lic Works Recommended: I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin, under the within Change Order. ~Ql i.})~ Q (;~ Comptroller ~/ . ,~ "- \ " CONTRACT: 06-05 CHANGE ORDER # 1 ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION I ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN DESCRIPTION CONTRACT CONTRACT NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE 1 Furnish and install a ten (10) day detour with changeable message board for Algoma Boulevard, complete as specified, lump sum 1.00 1.00 $922.50 $922.50 2 Seventy percent of rental cost for 2 changeable message boards for Harrison St. detour @ Nevada Avenue, 6 days, lumo sum 1.00 1.00 $1,225.00 $1,225.00 3 Saw and remove curb head for curb ramps @ two (2) locations, lump sum 1.00 1.00 $537.50 $537.50 4 Slip form curb and gutter on north side of Algoma Boulevard, oer linear foot 1,152.00 1,152.00 $1.71 $1,969.92 NET INCREASE TO SECTION I - $4,654.92 $4,654.92 $0.00 ADDITIONAL WORK: C.O. # 1 - (ITEMS 1 - 4) - SUB-TOTAL ADDITIONAL WORK REQUIRED: C.O. # 1 - SECTION IV ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT PRICE PRICE 1 Relay new 8" water main (Fulton Avenue - N. Main St. to Grand St.) Relay new 6" water main (Fulton Avenue - Grand St. to Railroad) 1A Relay 1,180 linear ft. of 8" water main, oer linear ft. 1,180.00 1,180.00 $64.26 $75,826.80 1B Relay 260 linear ft. of 6" water main, oer linear ft. 260.00 260.00 $64.26 $16,707.60 1C Install two (2) 6" valves, each 2.00 2.00 $754.65 $1,509.30 10 Install six (6) 8" valves, each 6.00 6.00 $922.50 $5,535.00 1E Install one (1) Hydrant, each 1.00 1.00 $1,892.39 $1,892.39 ADDITIONAL WORK: C.O. # 1 (ITEMS 1A -1F) - SUB-TOTAL $101,471.09 $0.00 $101,471.09 NET INCREASE TO SECTION IV - $106,126.01 NET INCREASE TO CONTRACT: Page 1