Potter Lawson
Contract Change Order
CO# @]
15 Ellis Potter Court
P.O. Box 44964
Madison, WI 53744-4964
Project: City of Oshkosh Security Improvements
608/274-2741
608/274-3674 (FAX)
Project No.: 2004.17.01
To Contractor:
Suburban Electric
Date Issued:
1/11/2006
Contract For:
All Security Work
Contract Date:
Sep.05
DESCRIPTION OF THE WORK, STATEMENT OF NECESSITY, AND SOURCE OR REQUEST
(If work started, state reason,date and person authorizing)
The following shall be provided subject to the requirements of the contract and bond already executed the same as if
herein repeated. Furnish all labor, materials, tools, equipment and transportation required to complete the fOllowing
item(s) of work.
AMOUNT
1. Revise locking devices at City Hall entries. Reference Suburban Electric proposal dated 12/8/05 for
additional detail.
2. Revise locking devices at water utility door entries. Reference Suburban Electric proposal dated
12/8/05 for additional detail.
3. Provide remote transmitter/receiver for pan/tilt/zoom camera at Police Department pole mounted
fixture. Reference Suburban Electric proposal dated 12/9/05 for additional detail.
$8,520.00
$6,730.00
$4,675.00
" provisions
'~ave been made to pay the liability which will
accrue under this contract
):CL. J1L1AO (A,/\.1 ~ J
City Comptroller
ThE! Original Contract Sum was... ... ....................................... ....... ..........................................
Net Change by Previously Authorized Change Orders................................................................................
The Contract Sum prior to this Change Order was.....................................................................
The Contract Sum will be increased/(decreased)/unchanged by this Change Order.........................
The New Contract Sum including this Change Order will be........................................................
$
$
$
$
$
19,925.00
113,600.00
0.00
113,600.00
19,925.00
133,525.00
Total Add/(Deduct)
DaY~
The Contract Time will be increased/(decreased)/unchanged by..................................................
The Date of Substantial Completion as of the date of this Change Order therefore is............ ........... ....... .........
7l1l~
(SIgnature)
ARCHITECT'S RECOMMENDATION:
~~&.;)1i,. ~
(&(gna .
DATE /-1/-&6- ~
'-i.
p'~me a R~' Ub;; g,
Q:\MASTERS\Caforms\COFORM.xls 0 ed:
\-
Attorney
Submitted to:
Gary McLean
Potter Lawson
15 Ellis Potter Court
P.O. 44964
Madison, WI 53711
Phone: 608-274-2741 . Fax: 608-274-3674
Providing Predictive / Proactive Services
Electrical, Division l6special
Date: December 8, 2005
Change Request
Job name:
Job location:
Quote #:
City Of Oshkosh - Security pro~I' ect
City Hall and Water Treatment
ProposedDoorChange 12-08-05
A. Scope Of Change
Provide and install all needed equipment to eliminate the wireless reader / locks and replace them with
magnetic locks, HID readers, REX sensors, and door contacts. In addition, this document will provide for
the mag-locks and door strikes required at the water treatment plant. The wireless receivers already
purchased will be re-stocked. Re-stocking fee included. All required raceway and wall penetrations are
included. Revised drawings and documentation included.
B. City Hall
. Three sets of mag-locks
. Three HID ProxPro readers
. Three each: door contacts, REX sensors, and mag-lock release buttons
. Required raceway and all device cable and all installation labor
Sub- Total for City Hall:
$ 8,520.00
c. Water Treatment
. Mag-lock for front door, plus two door strikes and one mag-lock (for the other 3 doors)
. One HID ProxPro reader
. One each REX sensor, and two each mag-lock release buttons, and door contacts
. Required raceway and all device cable and all installation labor for front door
Sub-Total for Water Treatment: $ 6,730.00
Payment per following: 30 days net on monthly progress invoices
This proposal may be withdrawn if not accepted within 30 days. A late payment of I 1/2% (18% annual) will be charged to the unpaid balance after 30 days.
Any deviation from above specifications involving extra cost will be executed only upon written orders, and will become an extra charge over and above the
estimate. Performance by Suburban Electric upon the terms herein is contingent upon circumstances outside the reasonable control of Suburban Electric (i.e.
liabilities for additional material cost or availability due to current market conditions), and Suburban Electric shall not be responsible for any failure to
perform attributable to such circumstances. LIEN NOTICE: As required by the Wisconsin Construction Lien Law, Suburban Electric hereby notifies
Owner that persons or companies furnishing labor or materials for the construction on Owner's land may have lien rights on that land and on the buildings on
that land if they are not paid for such labor or materials. Those entitled to lien rights, in addition to Suburban Electric, are those who contract directly with
the Owner or those who give the Owner notice within 60 days after they first furnish labor or materials for the construction. Accordingly, Owner probably
will receive notices from those who furnish labor or materials for the construction and should give a copy of each notice received to his mortgage lender, if
any. Suburban Electric agrees to cooperate with the Owner and his lender, if any, to see that all potential lien claimants are duly paid.
Acceptance of proposal: (customer)
x
Date:..
Dave Spielbauer
709 Hickory Farm Lane, Appleton, Wisconsin 54914-3074 · Phone: (920) 739-5156 · Fax: (920) 739-4767
www.suburbanelectric.com
Powerful Commitments. Proven Results
Submitted to:
Gary McLean
Potter Lawson
15 Ellis Potter Court
P.O. 44964
Madison, WI 53711
Phone: 608-274-2741 . Fax: 608-274-3674
Providing Predictive I Proactive Services
Electrical, Division l6special
Date: December 9, 2005
Change Request
Job name:
Job location:
Quote #:
City Of Oshkosh - Security prq:J' ect .
Wireless P/T/Z For Police Dept
ProposedPTZChange 12-09-05
A. Scope Of Change
Provide and install a wireless P/T/Z system for the Pelco Spectra IIIse dome specified for the outdoor
camera location. It has been determined that there is no available conduit space to allow the installation of
fiber optic cable out to the lot pole, and wireless is the only viable alternative. Revised drawings and.
documentation included.
B. Wireless P/T/Z Equipment .
. One set of Verint SmartLink 5-G wireless point to point transceivers
. Labor to install both the transmitter at the camera and the receiver at the head-end
Installed:
$ 4,675.00
C. Notes
. System operates at 5 GHz
. Built for both video and control
. Built for outdoor installations
. Required l20vac for receiver by EC
Payment per following: 30 days net on monthly progress invoices
This proposal may be withdrawn ifnot accepted within 30 days. A late payment of 1 1/2% (18% annual) will be charged to the unpaid balance after 30 days.
Any deviation from above specifications involving extra cost will be executed only upon written orders, and will become an extra charge over and above the
estimate. Performance by Suburban Electric upon the terms herein is contingent upon circumstances outside the reasonable control of Suburban Electric (i.e.
liabilities for additional material cost or availability due to current market conditions), and Suburban Electric shall not be responsible for any failure to
perform attributable to such circumstances. LIEN NOTICE: As required by the Wisconsin Construction Lien Law, Suburban Electric hereby notifies
Owner that persons or companies furnishing labor or materials for the construction on Owner's land may have lien rights on that land and on the buildings on
that land if they are not paid for such labor or materials. Those entitled to lien rights, in addition to Suburban Electric, are those who contract directly with
the Owner or those who give the Owner notice within 60 days after they first furnish labor or materials for the construction. Accordingly, Owner probably
will receive notices from those who furnish labor or materials for the construction and should give a copy of each notice received to his mortgage lender, if
any. Suburban Electric agrees to cooperate with the Owner and his lender, if any, to see that all potential lien claimants are duly paid.
Acceptance of proposal: (customer)
x
Date:
Dave Spielbauer