Loading...
HomeMy WebLinkAbout2007-Building (remodel) o CITY OF OSHKOSH No 123197 OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 3001 S WASHBURN ST Owner FIRST HORIZON GROUP LIMITED PTNSHP Create Date 01/17/2007 Designer Shremshock Architechts Inc. Contractor DEJAGER CONSTRUCTION INC Category 232 - Alteration Stores & Customer Service Plan X2-1887-0107 Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. D Projection I Finished/Living Canopies Sq.Ft. Sq.Ft. Bedrooms Stories Signs Garage Baths Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units o # Structures o Use/Nature Space A80 - Factory Brand Shoes - Alterations to existing tenant space as per plans - No Structural changes. As noted in December 12, of Work email an emergency lighting plan is required to be submitted. Plumbing Contractor HV AC Contractor Electric Contractor $0.00 Permit Fee Paid $160.00 Park Dedication $0.00. Fees: Valuation .---...$24. Ogp: 00 d B ./J--- Issue y: '" Date 01/17/2007 Final/O.P. 00/00/0000 Parcel Id # 1329420000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement he City strongly urges the permit applicant to contact the easement holder(s) and to se u n essary f re s such activity. Signature Date Address 75 60TH ST WYOMING MI 49548 - 5761 Telephone Number 616-530-0060 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.