HomeMy WebLinkAbout0121787-Plumbing
e
OSHKOSH
ON THE WATER
Job Address 2855 S OAKWOOD ST
CITY OF OSHKOSH
No
121787
PLUMBING PERMIT - APPLICATION AND RECORD
Contractor AHERN-GROSS INC.
Owner BRUNSWICK CORP Create Date 09/19/2006
Category 440 - Industrial-Interior Plan V1-218-0906-P
Water Softner Wait. St. Shamp Sink Coffee Maker
Local Waste Ice Chest FlrlWst Sink Int Grease Trap 0
Clothes Wshr Exam Sink Catch Basin Ext Grease Trap
Bidet Sculry Sink Wash Ftn RPZ Valve
Beer Tap Hand Sink Urinal 4 Eye Wash Statn
Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
Steri I izer Surgeons Sink Ice Maker Deduct Meters
Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Drink Ftn 2 Serv Sink Soda Disp
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
/Roof Drain
Misc.
Fixtures
Shower
Floor Drain
4 Lndry Tray
8 Disposal
2 Dishwasher
Sump Pump
2 Classrm Sink
3 Breakrm Sink
Ejector/Grind
2 hose bibb, oil interceptor.
1
4
Use/Nature New Factory / 94,276 sf factory, 10,950 sf office.
of Work
Valuation
Issued By
Size
Material
Type
#
Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcel Id #
1329110000
$65,000.00
$0.00
$245.00 0 Permit Voided I
Permit Fees
Plan Approval
Date 09/29/2006
In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this p~rl]l.it plication with' an easement, the City strongly urges the permit applicant to contact the
easement holde a 0 secure a n cessa pprovals before starting such activity.
Signature Date '1-36 - .;200!t:?
AgenUOwner
FOND DU LAC
WI 54935 - 0000 Telephone Number 920-921-1414
Address 218 S MAIN ST
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.