Loading...
HomeMy WebLinkAbout0121787-Plumbing e OSHKOSH ON THE WATER Job Address 2855 S OAKWOOD ST CITY OF OSHKOSH No 121787 PLUMBING PERMIT - APPLICATION AND RECORD Contractor AHERN-GROSS INC. Owner BRUNSWICK CORP Create Date 09/19/2006 Category 440 - Industrial-Interior Plan V1-218-0906-P Water Softner Wait. St. Shamp Sink Coffee Maker Local Waste Ice Chest FlrlWst Sink Int Grease Trap 0 Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal 4 Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Steri I izer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn 2 Serv Sink Soda Disp Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain /Roof Drain Misc. Fixtures Shower Floor Drain 4 Lndry Tray 8 Disposal 2 Dishwasher Sump Pump 2 Classrm Sink 3 Breakrm Sink Ejector/Grind 2 hose bibb, oil interceptor. 1 4 Use/Nature New Factory / 94,276 sf factory, 10,950 sf office. of Work Valuation Issued By Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcel Id # 1329110000 $65,000.00 $0.00 $245.00 0 Permit Voided I Permit Fees Plan Approval Date 09/29/2006 In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this p~rl]l.it plication with' an easement, the City strongly urges the permit applicant to contact the easement holde a 0 secure a n cessa pprovals before starting such activity. Signature Date '1-36 - .;200!t:? AgenUOwner FOND DU LAC WI 54935 - 0000 Telephone Number 920-921-1414 Address 218 S MAIN ST To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.