Loading...
HomeMy WebLinkAbout2006-Plumbing o OSHKOSH ON THE WATER Job Address 1128 WASHINGTON AVE CITY OF OSHKOSH 122275 No PLUMBING PERMIT - APPLICATION AND RECORD Create Date 10/26/2006 Owner JOHN M/EVELYN J MINNIEAR Plan Category 410 - Residential-Interior Contractor JIM'S PLUMBING & HEATING INC Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Shamp Sink FlrlWst Sink Catch Basin Wash Ftn Urinal Standp Rec Ice Maker Gar Drain Soda Disp Wait. St. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink Water Softner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work SFRlRemodel bathroom Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcel Id # 1100390000 $25.00 0 Permit Voided I $0.00 Permit Fees $4,000.00 Plan Approval Ufnvo Valuation Date 10/26/2006 Issued By In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Date Signature Agent/Owner GREENVILLE WI 54942 - 0000 Telephone Number 920-757-5258 Address W6166 GREENVILLE DR To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.