Loading...
HomeMy WebLinkAbout2006-Building o OSHKOSH ON THE WATER Job Address 1128 WASHINGTON AVE CITY OF OSHKOSH No 122102 BUILDING PERMIT - APPLICATION AND RECORD Owner JOHN M/EVEL YN J MINNIEAR Create Date 10/17/2006 Designer Contractor CENTRAL STREET CARPENTRY Category 140 -Interior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq.Ft. Sq.Ft. Rooms Height Ft. o Projection I Finished/Living Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature SFRI Converting a closet on the 3rd floor to a bathroom*. Seperate permits will be required for plumbing and electric work. Paneling will of Work be installed on existing wallis. The attic is currently partially finished. HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $9,000.00 Plan Approval $0.00 Permit Fee Paid $81.00 Park Dedication $0.00 Issued By: .~ Date 10/17/2006 Final/O.P. 00/00/0000 o Permit V~9~~ Parcel Id # 1100390000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit appli~nt to contact the easement ) holder(s) and to secure necessary efore starn such activity. ( r Signature Date ~ lD.....I'"Z-qo Address 1435 CENTRAL ST Agent/Owner OSHKOSH WI 54901 - 0000 Telephone Number 426-5147 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.