CHANGE ORDER # 1
Dated: December 1, 2005
TO: Fischer-Ulman Construction, Inc.
1115 S. Theodore Street
Appleton, WI 54915
Your present contract with the City of Oshkosh, Contract No.
and changed as follows:
05-06 , is hereby amended
NET INCREASE TO SECTION 1- SIDEWALK REHAB:
$33,782.95
NET INCREASE TO CONTRACT:
$33,782.95
CITY OF OSHKOSH
Recommended:
b~Jc,
Director of Publi
Approved and accepted:
U/~.~a"
Contractor
I certify that provision has been made to pay the liability that will accrue to .the City of
Oshkosh, Wisconsin, under the within Change Order.
~fl~ Q...f/~o~
Comptroller
CONTRACT: 05-06 CHANGE ORDER # 1
SECTION I - SIDEWALK REHAB
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
DESCRIPTION CONTRACT CONTRACT
NUMBER QUANTITIES QUANTITIES INCREASE DECREASE UNIT PRICE PRICE
1 Approx. 71,000 square feet
of sidewalk removal &
driveway removal,
complete as specified, per ($767.06)
square foot 71,000.00 68,443.13 -2,556.87 $0.30
2 Approx. 4,000 linear feet of
concrete/asphalt sawing,
complete as specified, per
linear foot 4,000.00 6,716.60 2,716.60 $2.60 $7,063.16
3 Construct approx. 78,500
square feet of 4" thick
concrete sidewalk in
various locations in the City
of Oshkosh, complete as
specified, per square foot ($636.86)
78,500.00 78,233.53 -266.47 $2.39
4 Approx. 150 square feet of
brick paver restoration at
six (6) sites on 400 block of
N. Main Street (brick
pavers to be supplied by ($1,950.00)
citv), oer square foot 150.00 -150.00 $13.00
5 Construct approx. 20,400
square feet of 6" thick
concrete sidewalk in
various locations in the City
of Oshkosh, complete as
specified, per square foot
20,400.00 15,255.80 -5,144.20 $2.96 ($15,226.83)
6 Construct approx. 2,500
square feet of 6" thick
textured concrete wheel
chair ramps, complete as
soecified oer square foot 2,500.00 3,691.22 1,191.22 $3.60 $4,288.39
7 Approx. 2,500 square feet
of three (3") inch asphalt
replacement, complete as
soecified, oer square foot 2,500.00 948.80 -1,551.20 $3.00 ($4,653.60)
8 Approx. 250 linear feet of
curb and gutter removal,
complete as specified, per
linear foot 250.00 156.90 -93.10 $4.00 ($372.40)
9 Approx. 300 linear feet of
30" curb and gutter,
complete as specified, per
linear foot 300.00 279.40 -20.60 $15.80 ($325.48)
10 Approx. 1,000 square yards
of terrace restoration,
including seed, fertilize,
and mulch, complete as
specified, per square yard
1,000.00 2,072.10 1,072.10 $3.50 $3,752.35
Page 1
CONTRACT: 05-06 CHANGE ORDER # 1
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT
PRICE PRICE
11 Furnish and install approx.
50 pavement ties,
complete as specified,
each 50.00 70.00 20.00 $7.00 $140.00
12 Construct approx. 4,000
square feet of 4" thick
concrete sidewalk in Water
Dept. repair locations at
approx. 60 sites, complete
as specified, per square
foot 4,000.00 3,198.67 -801.33 $3.85 ($3,085.12)
13 Construct approx. 1,000
square feet of 6" thick
concrete sidewalk in Water
Dept. repair locations at
approx. 20 sites, complete
as specified, per square
foot 1,000.00 1,069.09 69.09 $3.95 $272.91
14 Approx. 100 square yards
of 7" non-reinforced
concrete pavement
removal and replacement,
including sawing,
pavement ties, integral
curb & grading, terracing &
traffic control, complete as
specified, per square yard
100.00 78.53 -21.47 $37.30 ($800.83)
15 Approx. 1,500 square yards
of 8" non-reinforced
concrete pavement
removal and replacement,
including sawing,
pavement ties, integral
curb & grading, terracing &
traffic control, complete as
specified, per square yard
1,500.00 349.26 -1,150.74 $38.90 ($44,763.79)
16 Approx. 700 square yards
of 8" special High Early
Strength, non-
reinforced concrete
pavement removal and
replacement, including
sawing, pavement ties,
integral curb and grading,
terracing and traffic control,
complete as specified, per
SQua 700.00 65.59 -634.41 $42.00 ($26,645.22)
17 Approx. 250 tons extra
crushed stone base,
complete as specified, per
ton 250.00 290.74 40.74 $10.50 $427.77
Page 2
CONTRACT: 05-06 CHANGE ORDER # 1
. ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE 'UNIT CONTRACT CONTRACT
PRICE PRICE
18 Approx. 1,200 linear feet of
No.4 epoxy-coated
reinforcement rods,
installed as specified, per
linear foot 1,200.00 800.00 -400.00 $1.35 ($540.00)
19 Provide $1,500 to the City
of Oshkosh for project
management
communications, complete
as specified, lump sum
1.00 1.00 $1,500.00
SECTION 1- (BID ITEMS 1 -19) - SUB-TOTALS
$15,944.58 ($99,767.19)
ADDlTONAL WORK REQUIRED: C.O. # 1 - SECTION I
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT
PRICE PRICE
1 7"/7 bag non-
reinforced concrete
pavement removal and
replacement, including
sawing, pavement ties,
integral curb &
grading, terracing &
traffic control,
complete as specified,
per squareyard
110.29 110.29 $38.90 $4,290.28
2 8"/7 bag non-
reinforced concrete
" pavement removal and
replacement, including
sawing, pavement ties,
integral curb &
grading, terracing &
traffic control,
complete as specified,
per square yard
1,074.74 1,074.74 $40.45 $43,473.23
Page 3
CONTRACT: 05-06 CHANGE ORDER #'1
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRIPTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT CONTRACT CONTRACT
PRICE PRICE
3 9"/6 bag non- ...
reinforced concrete
pavement removal and
replacement, including
sawing, pavement ties,
integral curb &
grading, terracing &
traffic control,
complete as specified,
per square yard
24.80 24.80 $43.00 $1,066.40
4 9"/7 bag non-
reinforced concrete
pavement removal and
replacement, including
sawing, pavement ties,
integral curb &
grading, terracing &
traffic control,
complete as specified,
per square yard
89.31 89.31 $44.00 $3,929.64
5 9"/9 bag non-
reinforced concrete
pavement removal and .
replacement, including
sawing, pavement ties,
integral curb &
grading, terracing &
traffic control,
complete as specified,
per square yard
.
59.18 59.18 $45.00 $2,663.10
6 Brick mortar mahhole,
lump sum 1.00 1.00 $100.00 $100.00
7 Construct 7" thick
concrete sidewalk in
various locations in
the City of Oshkosh,
complete as specified,
per square foot
1,822.60 1,822.60 $3.46 $6,306.20
8 Repair misc. PVC
sumps, lump sum 1.00 1.00 $100.00 $100.00
Page 4
CONTRACT: 05-06 CHANGE ORDER # 1
ITEM CONTRACT INSTALLED NET NET COST PER INCREASE IN DECREASE IN
NUMBER DESCRipTION QUANTITIES QUANTITIES INCREASE DECREASE UNIT . CONTRACT CONTRACT
. PRICE PRICE
9 Placement of two (2)
castings at 509
Washburn Street,
lump sum 1.00 1.00 $50.00 $50.00
10 Erosion mat on
Washburn Street, per
square vard 1,055.20 1,055.20 $2.50 $2,638.00
11 Filling, compacting
services on backs lope
area of Washburn
Street/Witzel Avenue,
I per hour
10.00 10.00 $105.00 $1,050.00
12 Inlet protection on
Washburn Street,
each 16.00 16.00 $30.00 $480.00
13 Miscellaneous apron
installation services re:
Contract 05-09, per
square foot 17,384.70 17,384.70 $2.96 $51,458.71
NET INCREASE TO SECTION I -
$117,605.56
NET INCREASE TO SECTION I
NET DECREASE TO SECTIONS I, II, III, IV
$133,550.14
($99,767.19)
NET INCREASE TO CONTRACT:
$33,782.95