Loading...
HomeMy WebLinkAboutHighway Improvement/Pratt Trail Bridge STATE I MUNICIPAL AGREEMENT FORA HIGHWAY IMPROVEMENT PROJECT DATE: J.D.: HIGHWAY: LIMITS: COUNTY: November 2, 2005 4994-03-00 Design/4994-03-71 Const. Local Street LENGTH 0.048 mi. Pratt Trail Bridge, City of Oshkosh Winnebago The signatory City of Oshkosh hereinafter called the Municipality, through its undersigned duly authorized officers or officials, hereby requests the State of Wisconsin Department of Transportation, hereinafter called the State, to initiate and effect the highway or street improvement hereinafter described. The authority for the Municipality to enter into this agreement with the State is provided by Section 86.25(1), (2), and (3) of the Statutes. NEEDS AND ESTIMATE SUMMARY: Existing Facility (describe and give reason for request): The existing structure P-70-714 is a three span masonry filled arch bridge constructed in 1921. It has an overall Jength of approximately 55 feet. The existing structure bridge deck is in poor condition and was overlayed with asphalt in 1988. The wingwalls are also showing signs of settlement. Proposed Improvement (nature of work): Rehabilitation of structure P-70-714. Work includes removal of asphalt from behind the wings, install drains and granular backfill in addition to replacement of the deck. Describe non-participatiug work included in the project contract: Adjustment of any 'sanitary or water facilities within the project limits. Describe other work necessary to finish the project completely which will be undertaken independently by the Municipality: Negotiation and acquisition of any right of way for the project, if required. PHASE ESTIMATED COST Total Federal! State Municipal Estimated Cost Funds % Funds % Preliminary Engineering: I.D.4994-03-00 , State Review and Proratable $6,000 $0 0 $6,000 100 Real Estate Acquisition: Acquisition ? $0 0 ? 100 Construction (Participating): I.D. 4994-03-71 Normal Participating $45,000 $36,000 80 $9,000 20 SUBTOT AL: $51,000 $36,000 $15,000 Cost Sharill2! Application: TOTAL COST DISTRIBUTION: $51,000 $36,000 $15,000 This request is subject to the terms and conditions that follow and is made by the undersigned under proper authority to make such a request for the designated Municipality and upon acceptance by the' State shall constitute agreement between the Municipality and the State. Signed for and in behalf of City of Oshkosh Municipality Name Title March 1, 2006 Date See Page 1A Signed for and in behalf of the City of Oshkosh ~"'~..~ Ric ard A.'V\TpU~11-gk, City Manager ~~a~ Edward A. Nokes, City Comptroller I hereby certify that the necessary provisions have been made to pay the liability which will accrue under this contract. 1A .' TERMS AND CONDITIONS: 1. The initiation and accomplishment of the improvement will be subject to the applicable Federal and State regulations. 2. The Municipality will pay to the State all costs incurred by the State in connection with .the improvement which exceed Federal/State financing commitments or are ineligible for Federal/State financing. 3. Funding of each project phase (preliminary engineering, real estate, construction, and other) is subject to inclusion in an approved program. Federal aid and/or State transportation fund financing will be limited to participation in the costs of the following items as specified in the estimate summary: a) The grading, base, pavement, and rehabilitation of the existing structure. b) Catch basins and inlets for surface water drainage of the improvement with connections to the storm sewer mam. c) Construction engineering incidental to inspection and supervision of actual construction work. d) Signing and pavement marking. 4. Work necessary to complete the improvement to be financed entirely by the Municipality or other utility or facility owner includes the following items: a) New installations of or alteration of sanitary sewers and connections, water, gas, electric, telephone telegraph, fire or police alarm facilities, parking meters, and similar utilities. b) Damages to abutting property due to change in street or sidewalk widths, gr<:l,des, or drainage. c) Conditioning, if required, and maintenance of detour routes. d) Repair damages to roads or streets cause by reason of their use in hauling materials incidental to the improvement. e) Bridge width in excess of standards. e) Preliminary engineering and State review services. f) Real Estate for the improvement. 5. As the work progresses, the Municipality will be billed for work completed which is not chargeable to Federal/State funds. Upon completion of the project, a final audit will be made to determine the final division of costs. 6. If the Municipality should withdraw the project, it will reimburse the State for any costs incurred by the State in behalf of the project. 2 . . ... ~ l!:~ 7. The work will be administered by the State and may include items not eligible for Federal/State participation. 8. The Municipality will at its own cost and expense: a) Maintain all portions of the project that lie within its jurisdiction for such maintenance through statutory requirements in a manner satisfactory to the State and will make ample provision for such maintenance each year. b) Prohibit angle parking. c) Assume general responsibility for all public information and public relations for the project. d) Use the WisDOT Utility Accommodation Policy unless it adopts a policy which has equal or more restrictive controls. 9. Basis for Local Participation: Project ID 4994-03-00: This ill is for State review/proratable charges for processing and advertising of the project for letting and review of pertinent design documents. The City of Oshkosh's share of State review/proratable is 100% or approximately $6,000. Project ID 4994-03-71: This ill is for construction of the project which consists of rehabilitating the existing structure. The total estimated cost of construction is $45,000. The City of Oshkosh's share of participating construction costs is 20% or $9,000 based on the project being in an approved Local Bridge Program for construction which states an 80% federal and 20% local funding ratio. The City of Oshkosh's total share for State review and construction of the project is estimated at $15,000. Final costs wjl1 be based on the actual costs incurred. . Right of way for the project, if required, will be 100% the responsibility of the City of Oshkosh. 3