Loading...
HomeMy WebLinkAbout0123157-Plumbing (repair sewer lateral) G OSHKOSH ON THE WATER Job Address 414 BOYD ST CITY OF OSHKOSH No 123157 PLUMBING PERMIT - APPLICATION AND RECORD Owner CHARLOTTE M DORMAN Create Date 01/11/2007 Plan Contractor WISCONSIN EXCAVATING Category 401 - Residential-Exterior (laterals) Bathtub Shower Water Softner Wait. St. Shamp Sink Whirlpool Floor Drain Local Waste Ice Chest Flr/Wst Sink Lavatory Lndry Tray Clothes Wshr Exam Sink Catch Basin Toilet Disposal Bidet Sculry Sink Wash Ftn Res. Sink Dishwasher Beer Tap Hand Sink Urinal Bar Sink Sump Pump Lab Sink Plaster Sink Standp Rec Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Misc. Fixtures Use/Nature Repair sanitary sewer lateral. of Work Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs . Size Material Vitrified Clay Conn. Type Repair Type Lateral # Sanitary Sewer 6" Storm Sewer Water Service Valuation $2,000.00 $0.00 $50.00 D Permit Voided I Permit Fees Plan Approval Issued By In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit +$lication within an easement, the City rongly ur'lhe permit applicant to contact the easement holder n,tb secure <y,1y necessa prov ore starti ch activity. Signature Address W 8757 STATE RD 96 HORTONVILLE WI 54944 - 0000 Telephone Number 920-378-2021 Parcelld # 1100300000 Date 01/11/2007 Date /'-//-0 t To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.