HomeMy WebLinkAbout0123151-Plumbing (laterals)
G
OSHKOSH
ON THE WATER
Job Address 3865 EDGEWOOD RD
CITY OF OSHKOSH
No
123151
PLUMBING PERMIT - APPLICATION AND RECORD
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature NSFR laterals.
of Work
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
Owner PORTS IDE PROPERTIES Create Date 01/10/2007
Category 401 - Residential-Exterior(laterals) Plan
Water Softner Wait. St. Shamp Sink Coffee Maker
Local Waste Ice Chest FlrlWst Sink Int Grease Trap
Clothes Wshr Exam Sink Catch Basin Ext Grease Trap
Bidet Sculry Sink Wash Ftn RPZ Valve
Beer Tap Hand Sink Urinal Eye Wash Statn
Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
Sterilizer Surgeons Sink Ice Maker Deduct Meters
Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Drink Ftn Serv Sink Soda Disp
Contractor HANNA EXCAVATING
Size
Material
Plastic
Type
Lateral
#
Conn. Type
New
Sanitary Sewer
4"
Storm Sewer
Water Service
1-1/4"
Plastic
Lateral
New
Parcelld #
$2,500.00 Plan Approval
$0.00 Permit Fees
$100.00 0 Permit Voided I
Valuation
Issued By Date 01/10/2007
In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this it application with~'n an e ement, the City strongly urges the permit applicant to contact the
easement hold s) a to secure any ne ry approvals before starting such activity.
Signature ~ Date / - I tJ ..... CJ 7
AgenUOwner
OSHKOSH
WI 54904 - 0000 Telephone N~mber 235-6450
Address
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc~), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.