Loading...
HomeMy WebLinkAbout0123162-Plumbing (laterals) G OSHKOSH ON THE WATER Job Address 1821 OHIO ST CITY OF OSHKOSH No 123162 PLUMBING PERMIT - APPLICATION AND RECORD Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Gri nd Owner MICHAEL A ZESSIN Create Date 01/11/2007 Category 401 - Residential-Exterior (laterals) Plan Water Softner Wait. St. Shamp Sink Coffee Maker Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Contractor J & P EXCAVATING NSFRI Laterals-4" sanitary sewer and 1-1/4" water. ".debit acct Size Material Type # Conn. Type Sanitary Sewer 4" Plastic Lateral 1 New , Storm Sewer < Water Service 1-1/4" Plastic Lateral 1 New Parcel Id # 1407690000 $100.00 0 Permit Voided I $900.00 Plan Approval $0.00 Permit Fees Valuation Issued By Date 01/11/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 3162 SCENIC DR OSHKOSH WI 54904 - 0000 Telephone Number 379-0309 (C) To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.