Loading...
HomeMy WebLinkAboutPlumbing H1-13493-P - ,-~~.-,.~..,,:---""....,~-:-..._,:~,~:~_,~>~', ~4~,:,,~;:.'----'~:'-"--'''''-'<;.-'---",.,....,...--';'-i-"----~~'-::r--;:.~:_:-------.:.~:...-'-'---"'_~-;:~;"''''''''';':''''':''~'':~'':~_,~..':~~>'_ May 6, 1993 Curt Clausing Marathon Engineers 2~23 East Capital Dr. Appleton, WI 54913 Re: LaSalle Clinic 1855 S. Oakwood Plan #Hl-13493-P Gentlemen: Examination of the plumbing plans and specifications for the abovementioned project has been completed. In accord with Chapter 145, Wisconsin Statutes, and ILHR 81 through 85, Wisconsin Administrative Code, the plumbing plans and specifications are approved contingent upon compliance with the stipulation noted below: 1. Revised storm drainage system. The architect, professional engineer, registered designer, owner or plumbing contractor shall keep, at the construction site, one set of plans bearing the stamp of approval. In the event installation of this plumbing system has not commenced within two years from this date, this approval shall become void. A new appl ication accompanied by full examination fee shall be filed and an updated received before work may commence. In granting this approval, the City of Oshkosh or its representative does not hold itself liable for any defects in plans of specification, plan omissions, examination oversight, construction or any damage that may result in or after installation and reserves the right to order changes or addi tions should conditions arise making this necessary. It shall be necessary for installing plumber to obtain a plumbing permit from the City of Oshkosh before proceeding with actual installation of this plumbing system or any of its parts. Sincerely, WALTER CALLIES Plumbing Inspector