HomeMy WebLinkAboutPlumbing H1-13493-P
- ,-~~.-,.~..,,:---""....,~-:-..._,:~,~:~_,~>~', ~4~,:,,~;:.'----'~:'-"--'''''-'<;.-'---",.,....,...--';'-i-"----~~'-::r--;:.~:_:-------.:.~:...-'-'---"'_~-;:~;"''''''''';':''''':''~'':~'':~_,~..':~~>'_
May 6, 1993
Curt Clausing
Marathon Engineers
2~23 East Capital Dr.
Appleton, WI 54913
Re: LaSalle Clinic
1855 S. Oakwood
Plan #Hl-13493-P
Gentlemen:
Examination of the plumbing plans and specifications for the
abovementioned project has been completed.
In accord with Chapter 145, Wisconsin Statutes, and ILHR 81 through
85, Wisconsin Administrative Code, the plumbing plans and
specifications are approved contingent upon compliance with the
stipulation noted below:
1. Revised storm drainage system.
The architect, professional engineer, registered designer, owner or
plumbing contractor shall keep, at the construction site, one set
of plans bearing the stamp of approval.
In the event installation of this plumbing system has not commenced
within two years from this date, this approval shall become void.
A new appl ication accompanied by full examination fee shall be
filed and an updated received before work may commence.
In granting this approval, the City of Oshkosh or its
representative does not hold itself liable for any defects in plans
of specification, plan omissions, examination oversight,
construction or any damage that may result in or after installation
and reserves the right to order changes or addi tions should
conditions arise making this necessary.
It shall be necessary for installing plumber to obtain a plumbing
permit from the City of Oshkosh before proceeding with actual
installation of this plumbing system or any of its parts.
Sincerely,
WALTER CALLIES
Plumbing Inspector