Loading...
HomeMy WebLinkAbout0123130-Building (windows) e OSHKOSH ON THE WATER Job Address 711 E IRVING AVE CITY OF OSHKOSH No 123130 BUILDING PERMIT - APPLICATION AND RECORD Owner DAVID G/JUDITH ZARTER Create Date 01/09/2007 Designer Contractor WINDOW WORLD OF MILWAUKEE Category 141 - Exterior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Sq.Ft. Sq.Ft. Sq.Ft. Rooms Height .Ft. o Projection I Unfinished/Basement Finished/Living Bedrooms Stories Canopies Garage Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature SFR/ Install 9 vinyl replacement windows in existing openings. **DEBIT ACCT**. of Work HV AC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1,925.00 Plan Approval U/TJtx:J $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Issued By: Date 01/09/2007 Final/O.P. 00/00/0000 o Permit Voided I Parcelld # 1101740000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 235 MORRIS ST AgenUOwner FOND DU LAC WI 54935 - 0000 Telephone Number 920-923-4189 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specifi~d otherwise, we will assume the project is ready at the time th~ request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.