HomeMy WebLinkAbout0123130-Building (windows)
e
OSHKOSH
ON THE WATER
Job Address 711 E IRVING AVE
CITY OF OSHKOSH No 123130
BUILDING PERMIT - APPLICATION AND RECORD
Owner DAVID G/JUDITH ZARTER Create Date 01/09/2007
Designer
Contractor WINDOW WORLD OF MILWAUKEE
Category
141 - Exterior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Sq.Ft.
Sq.Ft.
Sq.Ft.
Rooms
Height .Ft.
o Projection I
Unfinished/Basement
Finished/Living
Bedrooms
Stories
Canopies
Garage
Baths
Signs
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature SFR/ Install 9 vinyl replacement windows in existing openings. **DEBIT ACCT**.
of Work
HV AC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$1,925.00 Plan Approval
U/TJtx:J
$0.00 Permit Fee Paid
$32.00 Park Dedication
$0.00
Issued By:
Date 01/09/2007
Final/O.P. 00/00/0000
o Permit Voided I
Parcelld # 1101740000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 235 MORRIS ST
AgenUOwner
FOND DU LAC
WI 54935 - 0000
Telephone Number
920-923-4189
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specifi~d otherwise, we will assume the project is ready at the time th~ request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.