Loading...
HomeMy WebLinkAbout0123106-Building (drop ceilings) e OSHKOSH ON THE WATER Job Address 327 SARATOGA AVE CITY OF OSHKOSH No 123106 BUILDING PERMIT - APPLICATION AND RECORD Owner SALZER SIDING INC Create Date 01/05/2007 Designer Contractor SALZER SIDING Category 140 - Interior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size UnfinishedlBasement Sq. Ft. Sq. Ft. Rooms Height Ft. D Projection I FinishedlLiving Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier o Treated Wood o Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature DUP\ Dropping ceilings in interior rooms* in the kitchen, living room and bathrooms and replace the front entry door. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1,200.00 Plan Approval o/-~ I $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Issued By: Date 01/08/2007 FinaIIO.P. 00/00/0000 o Permit Voided I Parcelld # 1008270000 In the performance of this work I agree to perform all work pursuant to rules governing the described cOnstruction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address PO BOX 825 OSHKOSH WI 54903 - 0825 Telephone Number (~20) 231-5025 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.