HomeMy WebLinkAbout2007-Plumbing (water softner)
e
OSHKOSH
ON THE WATER
Job Address 256 WYLDEWOOD DR #B
CITY OF OSHKOSH
No
123078
PLUMBING PERMIT - APPLICATION AND RECORD
Contractor SAMMONS PLUMBING
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
Water Softner
Local Waste
Clothes Wshr
Bidet
Beer Tap
Lab Sink
Sterilizer
Dip Well
Drink Ftn
Owner JUNE F WAGNER
Create Date
01/04/2007
Category 410 - Residential-Interior
Plan
Wait. St. .
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature CONDO UNIT /INSTALL WATER SOFTNER "debt acct
of Work
Shamp Sink
FlrlWst Sink.
Catch Basin
Wash Ftn
Urinal
Standp Rec
Ice Maker
Gar Drain
Soda Disp
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
.
Sanitary Sewer
Storm Sewer
Water Service
Size
Material
Type
#
Conn. Type
Parcelld #
1632000700
Valuation $1,000.00 Plan Approval __ $0.00 Permit Fees
Issued By ~ l~J
$25.00 D Permit Voided I
Date 01/04/2007
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work.
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature Date
Agent/Owner
Address 522W. MURDOCK AVE
OSHKOSH
WI 54901 - 2298 Telephone Number 231-9880
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.