Loading...
HomeMy WebLinkAbout0123081 P o OSHKOSH ON THE WATER JobAddress 1505ENEVADAAVE Contractor SAMMONS PLUMBING CITY OF OSHKOSH No 123081 PLUMBING PERMIT - APPLICATION AND RECORD Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures UselNature 'ISFR 1 INSTALL SUMP PUMP **debt acct of Work I I Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink EjectorlGrind Owner RUSSELL AlK DRILL Create Date 0110412007 Category 410 - Residential-Interior Plan Water Sottner Wait. St. Shamp Sink Coffee Maker - Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Bidet ,Sculry Sink . Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn 1 Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1513120000 Valuation_d___ $250.~lan Approval Issued By ~ $0.00 Permit Fees ________ $2?..:00 0 Permit Voided I .Date 01/04/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner OSHKOSH WI 54901 - 2298 Telephone Number 231-9880 Address 522 W. MURDOCK AVE To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (I.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.