HomeMy WebLinkAbout0123081 P
o
OSHKOSH
ON THE WATER
JobAddress 1505ENEVADAAVE
Contractor SAMMONS PLUMBING
CITY OF OSHKOSH
No
123081
PLUMBING PERMIT - APPLICATION AND RECORD
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
UselNature 'ISFR 1 INSTALL SUMP PUMP **debt acct
of Work
I
I
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
EjectorlGrind
Owner RUSSELL AlK DRILL Create Date 0110412007
Category 410 - Residential-Interior Plan
Water Sottner Wait. St. Shamp Sink Coffee Maker -
Local Waste Ice Chest FlrlWst Sink Int Grease Trap
Clothes Wshr Exam Sink Catch Basin Ext Grease Trap
Bidet ,Sculry Sink . Wash Ftn RPZ Valve
Beer Tap Hand Sink Urinal Eye Wash Statn
1 Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs
Sterilizer Surgeons Sink Ice Maker Deduct Meters
Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs
Drink Ftn Serv Sink Soda Disp
Size
Material
Type
#
Conn. Type
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
1513120000
Valuation_d___ $250.~lan Approval
Issued By ~
$0.00 Permit Fees ________ $2?..:00 0 Permit Voided I
.Date 01/04/2007
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Agent/Owner
OSHKOSH
WI 54901 - 2298 Telephone Number 231-9880
Address 522 W. MURDOCK AVE
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (I.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.