Loading...
HomeMy WebLinkAboutFire Protection System Installation J. F. AHERN CO. MECHANICAL & FIRE PROTECTION CONTRACTORS 201 Morris Court, P.O. Box 1316 Fond du Lac, WI 54936-1316 (920) 921-9020 p · (920) 921-8666 f www.jfahern.com RECEIVED December 27, 2006 Building Inspector -- Brian Noe City of Oshkosh 215 Church Avenue -- PO Box 1130 Oshkosh, WI 54901 T -920/236-5051 F-920/236-1130 JAN 0 2 2007 DEPARTMENT OF COMMUNITY DEVELOPMENT RE: FIRE PROTECTION SYSTEM INSTALLATION HUNTERS RIDGE BUILDING 7 3160 WHITE TAIL LANE OSHKOSH, WISCONSIN 54904 AHERN FIRE PROTECTION WORK ORDER No. 993882 Dear Brian: Enclosed is a copy of the Contractor's Material and Test Certificates covering the above-referenced Fire Protection System Installation for your files. Sincerely, AHERN FIRE PROTECTION A division of J. F. Ahern Co. ~~!l1$~ Mark L. Jozefowski, Superintendent MLJ/ksj LCITY12-27-06.DOC Building the Midwest Since 1880 An Equal Opportunity Employer f'" - , ,::;'; . ',,' ,".'J i:~~cOnSi" DOu6~~~:~~~~;~~~ector ~~~~*t;o:;:iO~ Department of Commerc~ Fax: (608)267-9723 ' ! TTY: (608) 264-8777 : ,~~.' Regulated Object Number: " _,~ ~ ~ ~~ ~ ,~' . ,http://www.commerce.state,wLus :' Personal information yOU provide may be used for secondary purposes [Privacy Law, s.1504 (1)(m)]'d . ' http://www.wisconsin.gov' OWNER INFORMATION Please print clearly in ballpoint pen., Additional information on h;~ck page. Vy( Owner Name Street Addres Initial Test 1 'st-check ;t3Closed tigh(' D LeakeQ i Static' \ \, PSID PSID "-"-~' -~ ~ - - ~'--- - - - -'- -~ -. - ~ - -- -~- . -. .' .' , - . .' ,,", ... Final Test D Closed tight Static PSID , D Closed tighf 2'nd check Static ,~-}': " <" ~:. '".\t~'~~': DETECTOR BYPASS ASSEMBLY INITIAL TEST 1'st check 2'nd check D, Closed tight D,' Closed tight' D Leaked DLeaked Static P$IP " ,Static PSID ~ ~ - -- - - - .,..., - - - - - - -1"&"- -, .,..., _ - .,..., -;; - - .,..., DETECTOR B"{PASS AS$I:M6L Y FINAL TEST ' D CloSE:ld tight 0 Closed tight Static PSID srnlic PSID "i,)"H~~~;;{r,.~$;~:~i": ;,.'::j!~~;":_:;'" ,J t ASSEMBLIES IN FIRE PROTECTION SYSTEMS Note: Include hose, ,stream dema,rJ,dn' where applicable Forward Flow Test 5 'Y..) I ' ' " (., () __ __ ~E:l:igfe~fl~w~t~_ _ __ _ ~~ _ _ _ _ _ _ _ _ '_, _ _ _ ~c~a~flo~ ~t~_ _ ~_ _G~M_ _ _ _ , li 'l I H~REBY CERTIF~ THr\<STRESWL~RE TRtE ~ND~ TEST~AS C.ONDUCT~mt2rRS~NALLY. 2;'~: ? S-A TesterNa,me(pnntL~~2 ~e ""'.' Reil'startlOnNo'q<'dci~O_,oJS-nzfofD,a,Y I <~l-~,',. " Tester Signature ~__ ' ' " ' Phone No., ' ' Date SBD-I0754 N. 12/02 Distributed to the following: Owner and tester rptB1ank_ WIDoubleCheck_DC_Detector "':;h;;t~k~#~~i4i~;l~~" D Tamper Switch ~~cked AHERN FIRE PROTECTION Contractor's Material and Test Certificate for Aboveground Piping PROCEDURE Upon completion of work, inspection and tests shall be made by the contractor's representative and witnessed by an owner's representative. All defects shall be corrected and system left in service before ,contractor's personnel finally leave the job. A certificate shall be filled out and signed by both representatives. Copies shall be prepared for approving authorities, owners, and contractor. It is understood the owner's representative's signature in no way prejudices any claim against contractor for faulty material, poor workmanship, or failure to comply with approving authoritv's reauirements or local ordinances. " PROPERTY NAME Hunters Ridge Condominiums AFP W.O. #: 993882 I DATE: October 23, 2006 PROPERTY ADDRESS 3160 White Tail Lane Oshkosh, WI 54904 ACCEPTED BY APPROVING AUTHORITIES (NAMES) 1. City of Oshkosh (Building Inspector -- Brian Noe) .' 2. Oshkosh Fire Department (Battalion Chief -- Stu Schrottky) 3. 4. ADDRESS j .' J 'I Plans 1. 215 Church Avenue -;. PO Box 1130 '-- Oshkosh,WI 54901 2. 101 Court Street -- Oshkosh, WI 54901 3. 4. INSTALLATION CONFORMS TO ACCEPTED PLANS ~~S ONO EQUIPMENT USED IS APPROVED ES ONO IF NO, EXPLAIN DEVIATIONS HAS PERSON IN CHARGE OF FIRE EQUIPMENT BEEN INSTRUCTED AS TO LOCATION ~ES ONO OF CONTROL VALVES AND CARE AND MAINTENANCE OF THIS NEW EQUIPMENT? INSTRUCTIONS IF NO, EXPLAIN HAVE COPIES OF THE FOLLOWING BEEN LEFT ON THE PREMISES: Item No.'s 2 & 3 will 1. SYSTEM COMPONENTS INSTRUCTION DYES mO be forwarded by AFP 2. CARE AND MAINTENANCE INSTRUCTIONS DYES " 0 at closeout time, 3. NFPA 25 o YES ~O LOCATION OF SUPPLIES BUILDINGS SYSTEM BuildinQ #7 MAKE MODEL YEAR OF K- QUANTITY TEMPERATURE MANUFACTURE FACTOR RATING Central LFII TY2234 Pendent 1/2" White 2006 4.9 54 155 Dec. SPRINKLERS PIPE AND TYPE OF PIPE CPVC FITTINGS TYPE OF FITTINGS CPVC FLOW ALARM DEVICE MAXIMUM TIME TO OPERATE , THROUGH TEST CONNEGTION TYPE MAKE MODEL MIN. SEC. Water Flow Detector System Sensor WFD , ~~ y N/A EXPLAIN ANY ALARM PROBLEMS: ALARM DEVICES LOW AIR ALARM DEVICE ALARM OPERATED TYPE MAKE MODEL PRESSURE PROPERLY SETTING PSI N/A I " YES I NO I EXPLAIN ANY ALARM PROBLEMS: CENTRAL MONITORING SIGNALS RECEIVED ALARM SERVICE LOCA TION(S) TYPE OR PRESSURE NAME OF REMOTE WATERFLOW SWITCH LOW-AIR OTHER SERVICE DETECTOR FLOW SUPERVISORY SUPERVISING LOCA TION(S): STATION (ON-SITE) REMOTE REMOTE NAME OF SERVICE: MONITORING ALARM SERVICE SIGNALING (OFF-SITE) PHONE: OTHEI1: ',,,- LOCATION(S): S ~ cJ~ 6 ~~Sl E- t...2) e S ~ ~e~ c~ ~ ~ 'i \ c-\} V\ ') ~ EXPLAIN ANY ALARM SIGNALING PROBLEMS: DRY VALVE Q.O,D. MAKE MODEL SERIAL NO. MAKE MODEL SERIAL NO. TIME TO TRIP WATER TRIP POINT AIR TIME WATER ALARM THROUGH TEST AIR PRESSURE REACHED TEST OPERATED CONNECTION'" PRESSURE PRESSURE OUTLET 1,2 PROPERLY DRY PIPE MIN. SEC. PSI PSI PSI MIN. SEC. YES NO OPERATING WITHOUT TEST Q.O.D. WITH Q.O.D. IF NO, EXPLAIN: OPERATION: o PNEUMATIC o ELECTRIC o HYDRAULIC PIPING SUPERVISED DYES DNO DETECTING MEDIA SUPERVISED DYES DNO , DOES VALVE OPERATE FROM THE MANUAL TRIP, REMOTE, OR BOTH CONTROL STATIONS DYES DNO IS THERE AN ACCESSIBLE FACILITY IN EACH IF NO, EXPLAIN DELUGE & CIRCUIT FOR TESTING PREACTION DYES DNO VALVES DOES EACH CIRCUIT DOES EACH CIRCUIT MAXIMUM TIME TO OPERATE SUPERVISION OPERATE VALVE RELEASE OPERATE RELEASE MAKE MODEL LOSS ALARM YES NO YES NO MIN. SEC. '. LOCATION & MAKE & MODEL SETTING STATIC PRESSURE RESIDUAL PRESSURE FLOW RATE FLOOR (FLOWING) PRESSURE INLET OUTLET INLET OUTLET FLOW REDUCING (PSI) (PSI) (PSI) (PSI) (GPM) VALVE TEST Ahern Fire Protection 1 MEASURED FROM TiME iNSPECTORS TEST CONNECTION is OPENED. · NFPA 13 ONLY REQUIRES THE 60-SECONO LIMITATION IN SPECIFIC SECTiONS. 2 TEST DESCRIPTION TESTS BLANK TESTING GASKETS WELDING CUTOUTS (DISCS) HYDRAULIC DATA NAMEPLATE REMARKS SIGNATURES Ahern Fire Protection HYDROSTATIC: Hydrostatic tests shall be made at not less than 200 psi (13.6 bars) for two hours or 50 psi (3.4 bars) above static pressure in excess of 150 psi (10.2 bars) for two hours. Differential dry-pipe valve clappers shall be left open during test to prevent damage. All aboveground piping leakage shall be stopped. PNEUMATIC: Establish 40-psi (2.7 bars) air pressure and measure drop, which shall not exceed 1-1/2 psi (0.1 bars) in 24 hours. Test pressure tanks at normal water level and air pressure and measure air pressure drop, which shall not exceed 1-1/2 psi (0.1 bars) in 24 hours. ALL PIPING HYDROSTATICALLY TESTED AT 20 (. PSI L-Bar) for ~ HRS. IF NO, STATE REASON DRY PIPING PNEUMATICALLY TESTED DYES D NO EQUIPMENT OPERATES PROPERLY ES D NO DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT ADDITIVES AND CORROSIVE CHEMICALS, SODIUM SILICATE OR DERIVATIVES OR SODIUM SILICATE, BRINE, OR OTHER CORROSIVE CHEMICALS WERE NOT USED FO TESTING SYSTEMS OR STOPPING LEAKS? YES D NO DRAIN READING OF GAUGE LOCATE9 N..;AR WATER RESIDUAL PRESSURE WITH VALVE IN TEST TEST SUPPLY TEST CONNECTION~ PSI ( Bar) CONNECTION OPEN WIDE:~PSI LBar) UNDERGROUND MAINS AND LEAD IN CONNECTIONS TO SYSTEM RISER OTHER EXPLAIN FLUSHED BEFORE CONNECTION MADE TO SPRINKLER PIPING. VERIFIED BY COPY OF THE CONTRACTOR'S MATERIAL AND TEST CERTIFICATE FOR UNDERGROUND PIPING. D YE~O FLUSHED BY INSTALLER OF UNDERGROUND SPRINKLER PIPING DYES D NO IF POWDER-DRIVEN FASTENERS ARE USED IN CONCRETE, HAS IF NO, EXPLAIN REPRESENTATIVE SAMPLE TESTING BEEN SATISFACTORILY COMPLETED? DYES D NO DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING PROCEDURES COMPLY WITH THE REQUIREMENTS OF AT LEAST AWS B2.1? DO YOU CERTIFY THAT THE WELDING WAS PERFORMED BY WELDERS DYES QUALIFIED IN COMPLIANCE WITH THE REQUIREMENTS OF AT LEAST AWSB2.1? NUMBER USED o LOCATIONS WELDED PIPING IF YES... 'NO DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A DOCUMENTED QUALITY CONTROL PROCEDURE TO ENSURE THAT ALL DISCS ARE RETRIEVED, THAT OPENINGS IN PIPING ARE SMOOTH, THAT SLAG AND OTHER WELDING RESIDUE ARE REMOVED, AND THAT THE INTERNAL DIAMETERS OF PIPING ARE NOT PENETRATED? DO YOU CERTIFY THAT YOU HAVE A CONTROL FEATURE TO ENSURE THAT ALL CUTOUTS (DISCS) ARE RETRIEVED? NAME PLATE PROVIDED .kStYES D NO TOR (jl~NED) {~ TITL~;. 3 NUMBER REMOVED DYES DNO DNO DYES DNO ES D NO IF NO, EXPLAIN J :( .- 2 )'- crt(,. z;t'- DATE ~, -2 1-f:!9G