Loading...
HomeMy WebLinkAbout0123064-Plumbing (water heater) o OSHKOSH ON THE WATER Job Address 730 VINE AVE PLUMBING PERMIT - APPLICATION AND-RECORD CITY OF OSHKOSH No 123064 Owner LEE J TRITT Create Date 01/04/2007 Plan Contractor KOCH PLUMBING Category 411 - Residential-Water Heaters Bathtub Shower Water Softner Wait. St. Shamp Sink Whirlpool Floor Drain local Waste Ice Chest FlrlWst Sink Lavatory lndry Tray Clothes Wshr Exam Sink Catch Basin Toilet Disposal Bidet Sculry Sink Wash Ftn Res. Sink Dishwasher Beer Tap Hand Sink Urinal Bar Sink Sump Pump lab Sink Plaster Sink Standp Rec Water Heater Classrm Sink Sterilizer Surgeons Sink Ice Maker Site Drain Breakrm Sink Dip Well F Prep Sink Gar Drain Roof Drain Ejector/Grind Drink Ftn Serv Sink Soda Disp Misc. Fixtures Use/Nature SFRI Replace gas water heater. **DEBIT ACCT**. of Work Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Valuation $600.00 _n $0.00 $25.00 0 Permit Voided I Permit Fees Issued By Plan Approval ~ Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Parcelld # 0502950000 Date 01/04/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no autihority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necess<;lry approvals before starting such .activity. Signature Address 2005 DOTY ST AgenUOwner OSHKOSH WI 54902 - 0000 Telephone Number 920-231-6661 or 235 Date To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.