Loading...
HomeMy WebLinkAbout0123063-Plumbing (water heater) e OSHKOSH ON THE WATER Job Address 2120 BOWEN ST CITY OF OSHKOSH No 123063 PLUMBING PERMIT - APPLICATION AND RECORD Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Owner CHARLES A1MARIL YN J PERRY Create Date 01/04/2007 Category 411 - Residential-Water Heaters Plan Water Softner Wait. St. Shamp Sink Coffee Maker Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Contractor KOCH PLUMBING Multifamily - Apt #8 - replace gas water heater. "DEBIT ACCT". Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1522830000 $25.00 0 Permit Voided I Valuation $600.00 Plan Approval ~ ________~QoOO Permit Fees Issued By Date 01/04/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 2005 DOTY ST 9~r1KOS':i WI 54902 - 0000 Telephone Number 920-231-6661 or 235 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type.of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.