Loading...
HomeMy WebLinkAboutBuilding e OSHKOSH ON THE WATER Job Address 1237 LIBERTY ST CITY OF OSHKOSH No 123058 BUILDING PERMIT - APPLICATION AND RECORD Owner LOIS P/PATRICIA C HODGELL LIFE ESTATE Create Date Contractor STANLEY LEACH-BUILDER 01/03/2007 Designer Category 140 - Interior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Rooms Height Ft. o Projection I Finished/Living Sq.Ft. Bedrooms Stories Canopies Garage Sq. Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units o # Structures o Use/Nature FRI Remodeling the kitchen and bathroom*. The 2nd floor bathroom and the kitchen will be gutted and redrywalled and insulated. of Work HV AC Contractor ANDRESEN SHEET METAL Plumbing Contractor KOCH PLUMBING Electric Contractor CUMINGS ELECTRIC INC $11,800.00 Plan Approval $0.00 Permit Fee Paid $100.00 Park Dedication $0.00 Fees: Valuation Issued By: ~ Date 01/03/2007 Final/O.P. 00/00/0000 D_~_ermit Voided I Parcelld # 1203680000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary a rovals before starting such activity. ~ Date y!/3~ Signature Address 5099 SHERMAN RD Agent/Owner OSHKOSH WI 54901 . 9755 Telephone Number 235-2530 To schedule inspections please call the Inspection Request line at 236-5128 noting the A.ddress, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.