HomeMy WebLinkAboutBuilding
e
OSHKOSH
ON THE WATER
Job Address 1237 LIBERTY ST
CITY OF OSHKOSH
No
123058
BUILDING PERMIT - APPLICATION AND RECORD
Owner LOIS P/PATRICIA C HODGELL LIFE ESTATE Create Date
Contractor STANLEY LEACH-BUILDER
01/03/2007
Designer
Category
140 - Interior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement Sq. Ft.
Rooms
Height Ft.
o Projection I
Finished/Living
Sq.Ft.
Bedrooms
Stories
Canopies
Garage
Sq. Ft.
Baths
Signs
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units
o
# Structures
o
Use/Nature FRI Remodeling the kitchen and bathroom*. The 2nd floor bathroom and the kitchen will be gutted and redrywalled and insulated.
of Work
HV AC Contractor
ANDRESEN SHEET METAL
Plumbing Contractor
KOCH PLUMBING
Electric Contractor CUMINGS ELECTRIC INC
$11,800.00 Plan Approval
$0.00 Permit Fee Paid
$100.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
~
Date 01/03/2007 Final/O.P. 00/00/0000
D_~_ermit Voided I
Parcelld # 1203680000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary a rovals before starting such activity.
~
Date
y!/3~
Signature
Address 5099 SHERMAN RD
Agent/Owner
OSHKOSH
WI 54901 . 9755 Telephone Number 235-2530
To schedule inspections please call the Inspection Request line at 236-5128 noting the A.ddress, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.