Loading...
HomeMy WebLinkAbout0123043-Plumbing e OSHKOSH ON THE WATER Job Address 1730 CLlFFVIEW DR CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 123043 Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Owner GARY M/DIANNA L HILL Create Date 01/02/2007 Category 410 - Residential-Interior Plan Water Softner Wait. St. Shamp Sink Coffee Maker Local Waste Ice Chest FlrlWst Sink Int Grease Trap Clothes Wshr Exam Sink Catch Basin Ext Grease Trap Bidet Sculry Sink Wash Ftn RPZ Valve Beer Tap Hand Sink Urinal Eye Wash Statn Lab Sink Plaster Sink Standp Rec Wtr Sewer Mtrs Sterilizer Surgeons Sink Ice Maker Deduct Meters Dip Well F Prep Sink Gar Drain Wtr Usage Mtrs Drink Ftn Serv Sink Soda Disp Contractor HARDY PLUMBING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature of Work Valuation Issued By New bathroom addition. Size Material Type # Conn. Type Sanitary Sewer Storm Sewer Water Service Parcel Id # 1524721200 $3,000.00 Plan Approval $0.00 Permit Fees $25.00 D Permit Void~ Date 01/02/2007 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and secure any n~ ssary approvals before starting such activity. ...- /::: Address 2590 PALLlSADES LN Signature V;f~7 Date Agent/Owner APPLETON WI 54915 - 0000 Telephone Number 920-733-8457 To schedule inspections please caJl the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service., Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.