Loading...
HomeMy WebLinkAbout0123035-Building (2nd floor) e OSHKOSH ON THE WATER Job Address 146 ALGOMA BLVD CITY OF OSHKOSH No 123035 BUILDING PERMIT - APPLICATION AND RECORD Owner 146 ALGOMA BLVD LLC Create Date 12/29/2006 Designer Duane Helwig Contractor OWNER Category 223 - Alteration Offices, Banks, Professional Plan W7-1871-1206 Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: 3B Size Unfinished/Basement Sq. Ft. Rooms Height Ft. D Projection I Finished/Living Sq.Ft. Bedrooms Stories Canopies Signs Garage Sq. Ft. Baths Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units o # Structures o Use/Nature Comm/ Interior alterations to remodel 2nd floor as per State Approved plans Transaction ID No. 1345460. of Work HV AC Contractor Plumbing Contractor Electric ContraGtor $0.00 Permit Fee Paid $388.00 Park Dedication $0.00 Issued By: . Date 12/29/2006 FinaIlO.P.OO/OO/OOOO D Permit Voided I Parcelld # 0701230000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within ar/easement. the City strongly urges the permit applicant to contact the easement holder(s) and to s~cure a"l..nY necessary~.'rf","'" befo," ",",og '"'" ''''''!y. . I, ~ 1 . Slgnalu," I'Y\"W~IL; ~ j1...--- Dot. \;;L 1;2"1 J{:J J Agent/Owner Address 51051 AH MAYTAH RD OSHKOSH WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.