HomeMy WebLinkAbout0123035-Building (2nd floor)
e
OSHKOSH
ON THE WATER
Job Address 146 ALGOMA BLVD
CITY OF OSHKOSH No 123035
BUILDING PERMIT - APPLICATION AND RECORD
Owner 146 ALGOMA BLVD LLC Create Date 12/29/2006
Designer
Duane Helwig
Contractor OWNER
Category
223 - Alteration Offices, Banks, Professional
Plan W7-1871-1206
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const: 3B
Size
Unfinished/Basement Sq. Ft.
Rooms
Height
Ft.
D Projection I
Finished/Living
Sq.Ft.
Bedrooms
Stories
Canopies
Signs
Garage
Sq. Ft.
Baths
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units
o
# Structures
o
Use/Nature Comm/ Interior alterations to remodel 2nd floor as per State Approved plans Transaction ID No. 1345460.
of Work
HV AC Contractor
Plumbing Contractor
Electric ContraGtor
$0.00 Permit Fee Paid
$388.00 Park Dedication
$0.00
Issued By: .
Date 12/29/2006
FinaIlO.P.OO/OO/OOOO
D Permit Voided I
Parcelld # 0701230000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within ar/easement. the City strongly urges the permit applicant to contact the easement
holder(s) and to s~cure a"l..nY necessary~.'rf","'" befo," ",",og '"'" ''''''!y. . I, ~ 1 .
Slgnalu," I'Y\"W~IL; ~ j1...--- Dot. \;;L 1;2"1 J{:J
J Agent/Owner
Address 51051 AH MAYTAH RD OSHKOSH WI 54901 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.