Loading...
HomeMy WebLinkAbout0123024-Building e OSHKOSH ON THE WATER Job Address 1360 MARICOPA DR CITY OF OSHKOSH No 123024 BUILDING PERMIT - APPLICATION AND RECORD Owner ANDREW/DEIRDRE DEWITT Create Date 12/28/2006 Designer Contractor OWNER Category 140 -Interior Remodeling Plan Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: Size Unfinished/Basement Sq. Ft. Sq.Ft. Rooms Height Ft. o Projection I Finished/Living Bedrooms Stories Canopies Garage Sq.Ft. Baths Signs Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit . Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units o # Structures o Use/Nature SFRI Remove existing knee walls along 2 foundation walls, intall foam insulation, re-frame, thermal barrier, and reinstall existing wood of Work paneling, and enclose new fire place being installed under separate HV AC permit. No Structural Changes. HVAC Contractor Plumbing Contractor Electric Contractor Plan Approval $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Issued By: Date 12/28/2006 FinaIlO.P. 00/00/0000 D Permit Voided I Parcelld # 1312430000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to sec fJ any nece~;1Y approvals before. starting such activity. Signature ~~--- Date /.2/...2~~ Agent/Owner Address 1360 MARICOPA DR OSHKOSH WI 54904 - 8151 Telephone Number 426-0176 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.