HomeMy WebLinkAbout0123024-Building
e
OSHKOSH
ON THE WATER
Job Address 1360 MARICOPA DR
CITY OF OSHKOSH No 123024
BUILDING PERMIT - APPLICATION AND RECORD
Owner ANDREW/DEIRDRE DEWITT Create Date 12/28/2006
Designer
Contractor OWNER
Category
140 -Interior Remodeling Plan
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const:
Size
Unfinished/Basement
Sq. Ft.
Sq.Ft.
Rooms
Height
Ft.
o Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
Sq.Ft.
Baths
Signs
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit . Not Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units
o
# Structures
o
Use/Nature SFRI Remove existing knee walls along 2 foundation walls, intall foam insulation, re-frame, thermal barrier, and reinstall existing wood
of Work paneling, and enclose new fire place being installed under separate HV AC permit. No Structural Changes.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Plan Approval
$0.00 Permit Fee Paid
$32.00 Park Dedication
$0.00
Issued By:
Date 12/28/2006
FinaIlO.P. 00/00/0000
D Permit Voided I
Parcelld # 1312430000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to sec fJ any nece~;1Y approvals before. starting such activity.
Signature ~~--- Date /.2/...2~~
Agent/Owner
Address 1360 MARICOPA DR
OSHKOSH
WI 54904 - 8151 Telephone Number 426-0176
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.