HomeMy WebLinkAbout0123027-Building (interior alterations)
G
OSHKOSH
ON THE WATER
Job Address 250 CITY CENTER
CITY OF OSHKOSH No 123027
BUILDING PERMIT - APPLICATION AND RECORD
Owner CITY CENTER ASSOCIATES LLC Create Date 12/28/2006
Designer
Contractor C.D. SMITH
Category
223 - Alteration Offices, Banks, Professional Plan W7-1869-1206
Type
. Building
o Sign
o Canopy
o Fence
o Raze
Zoning
Class of Const: IA
Size
Height
Ft.
D Projection I
Unfinished/Basement Sq. Ft.
Rooms
Canopies
Finished/Living
Sq.Ft.
Bedrooms
Stories
Signs
Garage
Sq.Ft.
Baths
Foundation . Poured Concrete 0 Floating Slab
o Concrete Block 0 Post
o Pier 0 Other
o Treated Wood
Occupancy Permit Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units
o
# Structures
o
Use/Nature om/ Interior alterations to expand Miles Kimball tenant space as per plans.
of Work
HV AC Contractor
Plumbing Contractor
Electric Contractor
.00 Plan Approval
$0.00 Permit Fee Paid
$1,738.00 Park Dedication
$0.00
Issued By: --
Date 12/28/2006
Final/O.P. 00/00/0000
D Permit Voided I
Parcel Id # 0100600000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure:~ necessa7 ap~v:ls before starting such activity.
Signature. S ~6Z~' (! .b. J h-, .T't, Date / (;l-;2. 'iJ -tJ 6
Agent/Owner
Address PO BOX 1006
FOND DU LAC
WI 54936 - 1006 Telephone Number 924-2900
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.