Loading...
HomeMy WebLinkAbout0123027-Building (interior alterations) G OSHKOSH ON THE WATER Job Address 250 CITY CENTER CITY OF OSHKOSH No 123027 BUILDING PERMIT - APPLICATION AND RECORD Owner CITY CENTER ASSOCIATES LLC Create Date 12/28/2006 Designer Contractor C.D. SMITH Category 223 - Alteration Offices, Banks, Professional Plan W7-1869-1206 Type . Building o Sign o Canopy o Fence o Raze Zoning Class of Const: IA Size Height Ft. D Projection I Unfinished/Basement Sq. Ft. Rooms Canopies Finished/Living Sq.Ft. Bedrooms Stories Signs Garage Sq.Ft. Baths Foundation . Poured Concrete 0 Floating Slab o Concrete Block 0 Post o Pier 0 Other o Treated Wood Occupancy Permit Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units o # Structures o Use/Nature om/ Interior alterations to expand Miles Kimball tenant space as per plans. of Work HV AC Contractor Plumbing Contractor Electric Contractor .00 Plan Approval $0.00 Permit Fee Paid $1,738.00 Park Dedication $0.00 Issued By: -- Date 12/28/2006 Final/O.P. 00/00/0000 D Permit Voided I Parcel Id # 0100600000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure:~ necessa7 ap~v:ls before starting such activity. Signature. S ~6Z~' (! .b. J h-, .T't, Date / (;l-;2. 'iJ -tJ 6 Agent/Owner Address PO BOX 1006 FOND DU LAC WI 54936 - 1006 Telephone Number 924-2900 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.