HomeMy WebLinkAbout0122380-Plumbing
e CITY OF OSHKOSH No 122380
OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 2145-2155 S KOELLER ST Owner USPG PORTFOLIO TWO LLC Create Date 10/12/2006
Contractor PLUMB-RITE PLUMBING LLC
Category 440 - Industrial-Interior
Shower Water Softner Wait. St. Shamp Sink
Floor Drain Local Waste Ice Chest FlrlWst Sink
Lndry Tray Clothes Wshr Exam Sink Catch Basin
Disposal Bidet Sculry Sink Wash Ftn
Dishwasher Beer Tap Hand Sink Urinal
Sump Pump Lab Sink Plaster Sink Standp Rec
3 Classrm Sink Sterilizer Surgeons Sink Ice Maker
Breakrm Sink Dip Well F Prep Sink Gar Drain
Ejector/Grind Drink Ftn Serv Sink Soda Disp
Plan
Coffee Maker
Int Grease Trap
Ext Grease Trap
RPZ Valve
Eye Wash Statn
Wtr Sewer Mtrs
Deduct Meters
Wtr Usage Mtrs
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature ft2145 -Install 2 point-of-use water heaters for lavatories in new restrooms and 1 new electric water heater to serve building service sink.
of Work
Valuation
Issued By
Size
Material
#
Conn. Type
Parcelld #
1323100404
Date 11/0212006
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
e~sement holder(s) and ;vnossary approva:: before starting such activity.
Signature ~~ _ ~~
~ Agent/Owner
Type
Sanitary Sewer
Storm Sewer
Water Service
$400.00 Plan Approval
$0.00 Permit Fees
$25.00 0 Permit Voided I
o~
Date
//,... 2. '-0 G.
Address W9055 CTY RD AS
OAKFIELD
WI 53065 - 0000 Telephone Number home 583-2379
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.