Loading...
HomeMy WebLinkAbout0121857-Plumbing e OSHKOSH ON THE WATER Job Address 2145-2155 S KOELLER ST CITY OF OSHKOSH No 121857 PLUMBING PERMIT - APPLICATION AND RECORD Contractor PLUMB-RITE PLUMBING LLC 2 3 Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Water Softner 2 Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures Use/Nature Il'OMM-Rogan Shoes-Remodel (2145) of Work Owner USPG PORTFOLIO TWO LLC Category 440 - Industrial-Interior Wait. St. Shamp Sink Ice Chest FlrlWst Sink Exam Sink Catch Basin Sculry Sink Wash Ftn Hand Sink Urinal Plaster Sink Standp Rec Surgeons Sink Ice Maker F Prep Sink Gar Drain 1 Serv Sink Soda Disp Create Date 10/03/2006 Plan Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn Wtr Sewer Mtrs Deduct Meters Wtr Usage Mtrs Sanitary Sewer Size Storm Sewer Water Service Material Type # Conn. Type Valuation Issued By Parcelld # 1323100404 $8,000.00 Plan Approval __!O.J)() Permit Fees $63.00 D Permit Voided I Date 10/03/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature WI 53065 - 0000 Telephone Number home 583-2379 Address W9055 CTY RD AS Agent/Owner OAKFIELD Date To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.